Tender Details

Particulars Details
Title
Improvement Of Wss Bhayankar Group Of Villages In Gp Nihri And Ghadoi Phase Ii Jaral And Marhara Tehsil Nihri Distt. Mandi H.P.
Description
Co Rcc Sedimentation Tank Cum Raw Water Tank 100000 Ltr Capacity And Co Slow Sand Filter 80 Sqm In Two Units For Wss Bhayankar
Organisation Government of Himachal Pradesh
Tender Id 2023_HPIPH_79733_1
Reference
Number
EE JSD SNR TA eTender 2023-10800-15 dt. 4.10.2023
Tender Fee 400
EMD 43950
Tender Value
Place Sundernagar
Link https://hptenders.gov.in
Start Date October 04, 2023 23:50
End Date

11/10/2023 ( Expired 613 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Preparation of gis based master plans for phase ii, phase iii and announcement towns in tamil nadu

Consultancy services for preparation of gis based master plans for phase ii, phase iii and announcement towns in tamil nadu- package 9 gummidipoondi, tiruttani, sholinghur, jolarpettai, maduranthagam, thirukazhukundram

Read more
Preparation of gis based master plans for phase ii, phase iii and announcement towns in tamil nadu package 9

Consultancy services for preparation of gis based master plans for phase ii, phase iii and announcement towns in tamil nadu- package 1 punjai puliyampatti, bhavanisagar, sathyamangalam, bhavani

Read more
Package-1, works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw phase-ii solar power park for the development of 1200mw jalaun solar power park under umrepp

Works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw (phase-ii) solar power park for the development of 1200mw jalaun solar power park at pathrahi and amrod in jalaun

Read more
Lot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir

Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india

Read more
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Read more
Structural rehabilitation work and improvement of reservoir, dam, outlet and basic facilities of myntdu leshka stage-i dam in west jaintia hills district of meghalaya under drip-ii (package-viii)

Structural rehabilitation work and improvement of reservoir, dam, outlet and &amp#x0d basic facilities of myntdu leshka stage-i dam in west jaintia hills district of &amp#x0d meghalaya under drip-ii (package-viii)

Read more
Renovation of false ceiling in different areas under phase-ii in jcg and pcr science block at iit kharagpur.

Renovation of false ceiling in different areas under phase-ii in jcg and pcr science block at iit kharagpur.

Read more
Repair/ improvement of ext w/s pipeline, valves, nrv, cleaning/sanitization of ug/oh water reservoir, ug sumps incl tee section, bends , elbow and connected items in nofra, navy nagar, chunabhatti, rmsf and residential area under age e/m-ii karanja

Repair/ improvement of ext w/s pipeline, valves, nrv, cleaning/sanitization of ug/oh water reservoir, ug sumps incl tee section, bends , elbow and connected items in nofra, navy nagar, chunabhatti, rmsf and residential area under age e/m-ii karanja

Read more
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla

Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla

Read more
S r of various l r in mc mukerian under sr for the year 2022 23 2023 24 and 2024 25 in distt hoshiarpur including maintenance of road for 5 years one year defect liability period four years mainte group no. 17

S r of various l r in mc mukerian under sr for the year 2022 23 2023 24 and 2024 25 in distt hoshiarpur including maintenance of road for 5 years one year defect liability period four years mainte group no. 17

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise