Tender Details
About Tender
🚧 Procurement Opportunity: Fresh Water Pipeline Project 🚧 Kolkata Port Trust, Under The Aegis Of The Central Government's Ministry/Department, Is Seeking Bids For The Supplying And Laying Of A Fresh Water Pipe Line From Finger Jetty Gate To G.C. Berth Main Gate Within The Dock Zone, Hdc, Haldia. 📅 Bid Submission Deadline: July 16, 2024, 3:00 Pm Tender Fee: Inr 1770 Emd: Inr 159210 Interested Bidders Must Possess The Necessary Qualifications And Experience To Undertake Such Infrastructure Projects. Detailed Proposals, Including Technical Specifications, Cost Estimates, And Project Timelines, Are To Be Submitted In Accordance With The Project Requirements. Keywords: Fresh Water Pipeline, Infrastructure Project, Kolkata Port Trust, Central Govt. Ministry/Department, Haldia, Tender, Engineering Procurement Construction (Epc)Particulars | Details |
---|---|
Title |
Supplying And Laying Of Fresh Water Pipe Line From Finger Jetty Gate To G. C. Berth Main Gate In Dock Zone, Hdc, Haldia
|
Description |
Supplying And Laying Of Fresh Water Pipe Line From Finger Jetty Gate To G. C. Berth Main Gate In Dock Zone, Hdc, Haldia
|
Organisation | Kolkata Port Trust | Central Govt. Ministry/Department |
Tender Id | 2024_KoPT_813135_1 |
Reference Number |
I and CF/SDM/DOCK/T/1225 |
Tender Fee | 1770 |
EMD | 1.59 Lakh |
Tender Value | |
Place | Haldia |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=854876 |
Start Date | June 25, 2024 22:30 |
End Date |
16/07/2024 ( Expired 301 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Chambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreRepair and maintenance of boundary wall from the main gate to market area and different places in dvc colony at tilaiya dam,t.k. division konar
Repair and maintenance of boundary wall from the main gate to market area and different places in dvc colony at tilaiya dam,t.k. division konar
Read moreSpl repair /replacement of distribution water supply ci pipe line to di pipe line at zone a, c, e, o and q area at rangapahar military station
Spl repair /replacement of distribution water supply ci pipe line to di pipe line at zone a, c, e, o and q area at rangapahar military station
Read moreLaying of tower foundations, erection of towers, stringing and sagging of conductor for 220 kv d/c line from 400 kv s/s pgcil patiala to 220 kv s/s bhadson (to be upgraded from 66 kv s/s).
Laying of tower foundations, erection of towers, stringing and sagging of conductor for 220 kv d/c line from 400 kv s/s pgcil patiala to 220 kv s/s bhadson (to be upgraded from 66 kv s/s).
Read moreConstruction of road and drain from manpur road to near kabristan gate in ward 09 maihar
Construction of road and drain from manpur road to near kabristan gate in ward 09 maihar
Read moreConstruction of distribution system for 5177.98 ha. of cca including command area development (cad) of salandi left main canal from rd 59.970 km to 60.304 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 5177.98 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 59.970 km to 60.304 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreLaying/fixing of paver blocks(01)form nehru tiraha to thana and upto stadium in both sides of main road.(02)form nehru tiraha to sarra in both sides of main road.(03)form nehru tiraha to tahsil office in both sides of main road.
Laying/fixing of paver blocks(01)form nehru tiraha to thana and upto stadium in both sides of main road.(02)form nehru tiraha to sarra in both sides of main road.(03)form nehru tiraha to tahsil office in both sides of main road.
Read moreChambal alwar bharatpur water supply project package-iii based on hybrid annuity model (ham) ace(p) bharatpur nit no. 06/2024-25
Work of construction of cwr and block cwph at various locations for clusters laying of transfer main from block ps to block cps rising main from block cps to block esrs, construction of esrs laying of cluster distribution mains cabp pck 3 under jjm
Read moreof your Industry type