Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Estimate For Construction Of Internal Roads And 18 M Roads With Bm Bc In Sector 38, Mcg
|
| Description |
Estimate For Construction Of Internal Roads And 18 M Roads With Bm Bc In Sector 38, Mcg
|
| Organisation | Government of Haryana |
| Tender Id | 2023_HRY_319634_1 |
|
Reference Number |
202395768361 7DFB 457B 9124 89C301B3A908285ULB |
| Tender Fee | 15000 |
| EMD | 3.83 Lakh |
| Tender Value | |
| Place | Municipal Corporation Gurgaon |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in |
| Start Date | October 11, 2023 20:30 |
| End Date |
Expired
14/11/2023
Expired 979 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreExtension and new construction of staffs quarter and compound wall for p. h. sub-centre at mouza mangi, tq.- pandharkawada, dist.- yavatmal
Extension and new construction of staffs quarter and compound wall for p. h. sub-centre at mouza mangi, tq.- pandharkawada, dist.- yavatmal
Read moreof your Industry type