Tender Details

Particulars Details
Title
Kiifb Kila 1 Cr Infrastructure Development Of Glps Thuvvur In Malappuram District Construction Of New Building Composite Work
Description
Kiifb Kila 1 Cr Infrastructure Development Of Glps Thuvvur In Malappuram District Construction Of New Building Composite Work
Organisation Government of Kerala
Tender Id 2023_KILA_622787_7
Reference
Number
CM/KILA-KIIFB PMU/TENDER/R2-24/2022-23
Tender Fee 6508
EMD 50000
Tender Value
Place O/o the Chief Manager,KILA PMU,Thiruvananthapuram
Link https://etenders.kerala.gov.in
Start Date November 20, 2023 16:30
End Date

28/11/2023 ( Expired 532 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Vertical extension of new academic building g plus 1 2nd and 3rd floor including site development works at gauhati university under rusa 2.0

Vertical extension of new academic building g plus 1 2nd and 3rd floor including site development works at gauhati university under rusa 2.0

Read more
Construction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.

Construction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.

Read more
Wbpwd/pw(r)/sepd/piu-i/nit-07 of 2025-2026,sl-1

New construction of di road from 0.000 km to 2.876 km to replace the existing bankura-durgapur road (sh-9) with in 37th km to 39th km stretching approx 2.5 km within the mine boundary of trans damodar coal mine vested to the durgapur projects

Read more
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s

Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s

Read more
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s

Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s

Read more
Construction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a / 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj

Construction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a /&amp#x0d 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj.

Read more
Construction work of administrative building of cyber thana in district-fatehpur (u.p.)

Construction work of administrative building of cyber thana in district-fatehpur (u.p.)

Read more
Construction of govt. school building at achinathang new site. (phase 1st) under district plan

Construction of govt. school building at achinathang new site. (phase 1st) under district plan

Read more
Construction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of dg set.

Construction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of dg set.

Read more
Vertical extension of 3rd to 9th floor over the existing three storied academic building in the campus of state aided womens university at diamond harbour, in the district of south 24 parganas -- sitc ac balance work.

Vertical extension of 3rd to 9th floor over the existing three storied academic building in the campus of state aided womens university at diamond harbour, in the district of south 24 parganas -- sitc ac balance work.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise