Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Steam Turbine Lp Rotor Journal 2 Machining Polishing And Interstage
|
| Description |
Steam Turbine Lp Rotor Journal 2 Machining Polishing And Interstagesealing Fins Replacement Of Ntpc Anta
|
| Organisation | NTPC Limited(NTPC) |
| Tender Id | 2023_NTPC_77037_1 |
|
Reference Number |
NTPC/USSC-CPG2/9900260511 |
| Tender Fee | 0 |
| EMD | 5 Lakh |
| Tender Value | 0 |
| Place | C AND M CPG 2 Sipat Super Thermal Power Proj |
| Link |
View Original Tender Notice
https://eprocurentpc.nic.in |
| Start Date | June 15, 2023 23:30 |
| End Date |
Expired
26/08/2023
Expired 1145 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Single stage, vertical, back pressure steam turbine
Supply, erection and commissioning of single stage, vertical, back pressure steam turbine
Read moreSupply of double part endless wire rope sling as per specification attached,supply of sling with both end reeving, 6 x 37 fibre core construction as per specification attached,hp turbine turn buckle of min. 10 tonnes swl with both ends fork for turbine hp rotor as per specf,lp turbine turn buckle of min. 40 tonnes swl with both ends fork for turbine lp rotor as per specf
Supply of double part endless wire rope sling as per specification attached,supply of sling with both end reeving, 6 x 37 fibre core construction as per specification attached,hp turbine turn buckle of min. 10 tonnes swl with both ends fork for turbine hp rotor as per specf,lp turbine turn buckle of min. 40 tonnes swl with both ends fork for turbine lp rotor as per specf
Read moreAssembly of gas turbine rotor with the supply of consumables make
Assembly of gas turbine rotor with the supply of consumables makesiemens model v94.2 at ntpc dadri
Read moreTtps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul
Ttps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul
Read moreReconditioning refurbishment of rotor blade row1 of 13 d2 gas turbine of
Reconditioning refurbishment of rotor blade row1 of 13 d2 gas turbine ofntpc anta
Read moreRefurbishment and hsb of rgc turbine rotor of dhdt unit of mathura refinery
Refurbishment and hsb of rgc turbine rotor of dhdt unit of mathura refinery
Read moreProcurement of hip turbine rotor with complete blade assembly with extension shaft for main turbine of unit5and6, 2x660 mw units of csctpp, chhabra
Procurement of hip turbine rotor with complete blade assembly with extension shaft for main turbine of unit5and6, 2x660 mw units of csctpp, chhabra
Read moreRebabbiting of journal bearings and thrust pads of main turbine and tdbfp at stpp, jaipur, mancherial, telangana
Rebabbiting of journal bearings and thrust pads of main turbine and tdbfp at stpp, jaipur, mancherial, telangana
Read moreof your Industry type