Transmission Line Package Tl02 For 765 K V D/C Kurnool Iv Bidar Line Part Ii Rfx 5002004095
Description
Transmission Line Package Tl02 For 765 K V D/C Kurnool Iv Bidar Line Part Ii Associated With Transmission System For Integration Of Kurnool Iv Rez Phase I (For 4.5 Gw) Through Tariff Based Competitive Bidding (Tbcb) Route Prior To Rf P Bid Submission By Powergrid To Bpc.
Organisation Power Grid Corporation of India Limited | Central Govt. Ministry/Department
Tender Id 24979
Reference
Number
CC/T/W-TW/DOM/A04/24/16107
Tender Fee 25000
EMD 0
Tender Value
Place INDIA
Link https://apps.powergrid.in/pgciltenders/u/view-published-tender-details.aspx?tid=a53bbad2-2c49-4aa9-947b-9ebd797b4f47
Start Date December 05, 2024 03:05
End Date

18/12/2024 ( Expired 146 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.

Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.

Read more
Construction of 220 kv s/c dechu-tinwari line with 1x220 kv bay work at dechu and tinwari alongwith stringing of 2nd circuit on existing 132 kv s/c bhadala-khetusar line on d/c towers and 1x132 kv bay at 132 kv gss khetusar on trunkey basis

Construction of 220 kv s/c dechu-tinwari line with 1x220 kv bay work at dechu and tinwari alongwith stringing of 2nd circuit on existing 132 kv s/c bhadala-khetusar line on d/c towers and 1x132 kv bay at 132 kv gss khetusar on trunkey basis

Read more
Laying of tower foundations, erection of towers, stringing and sagging of conductor for 220 kv d/c line from 400 kv s/s pgcil patiala to 220 kv s/s bhadson (to be upgraded from 66 kv s/s).

Laying of tower foundations, erection of towers, stringing and sagging of conductor for 220 kv d/c line from 400 kv s/s pgcil patiala to 220 kv s/s bhadson (to be upgraded from 66 kv s/s).

Read more
Assessment of healthiness of tower and their residual life for 132 kv s/c adityapur - rajkharsawan tl, 132 kv s/c rajkharsawan - chandil tl and 132 kv d/c chandil - golmuri tl for the proposed work of reconductoring of existing 132 kv line by htls.

Assessment of healthiness of tower and their residual life for 132 kv s/c adityapur - rajkharsawan tl, 132 kv s/c rajkharsawan - chandil tl and 132 kv d/c chandil - golmuri tl for the proposed work of reconductoring of existing 132 kv line by htls.

Read more
Supply of material and di of 220 kv bansi-pgcil double circuit transmission line between location no. 177 to 180 and 191 to 196 under electricity transmission division-ii, basti h.q. at siddharth nagar

Supply of material and di of 220 kv bansi-pgcil double circuit transmission line between location no. 177 to 180 and 191 to 196 under electricity transmission division-ii, basti h.q. at siddharth nagar

Read more
Supply of insulation sleeve and self-fusing tape for transmission line applications in nr-iii and wr-ii regions of powergrid

Supply of insulation sleeve and self-fusing tape for transmission line applications in nr-iii and wr-ii regions of powergrid

Read more
Rejuvenation/ upliftment of tulmullah nallah u/s and d/s of mata kheerbawani shrine including protection works for smooth conduct of religious activities by way of (cleaning / flood protection works and rejuvenation of bathing area) part-ii

Rejuvenation/ upliftment of tulmullah nallah u/s and d/s of mata kheerbawani shrine including protection works for smooth conduct of religious activities by way of (cleaning / flood protection works and rejuvenation of bathing area) part-ii

Read more
Estimate for 04 km 11 kv line conductor aug. at piprai to kukaretha under piprai d/c under mungaoli division

Estimate for 04 km 11 kv line conductor aug. at piprai to kukaretha under piprai d/c under mungaoli division

Read more
Estimate for 04 km 11 kv line conductor aug. at barkheda to onder under bahadurpur d/c under mungaoli division

Estimate for 04 km 11 kv line conductor aug. at barkheda to onder under bahadurpur d/c under mungaoli division

Read more