Tender Details
About Tender
🔧 Rashtriya Ispat Nigam Limited (Rinl), Visakhapatnam, Invites Bids For The Overhauling Of Mill Equipments In The Wire Rod Mill. 🏭🔧 Bid Submission Deadline: 15/05/2024, 3:00 Pm ⏳ This Tender Is For The Overhauling Of Critical Equipment Within The Wire Rod Mill At Rinl, Visakhapatnam. Interested Bidders Should Submit Detailed Technical And Financial Bids, Demonstrating Their Capability To Execute The Project As Per The Specifications And Timelines Provided. Keywords: Overhauling, Mill Equipments, Wire Rod Mill, Rashtriya Ispat Nigam Limited, Rinl, Visakhapatnam, Central Govt. Tender, Industrial Equipment MaintenanceParticulars | Details |
---|---|
Title |
Overhauling Of Mill Equipments In Wire Rod Mill.
|
Description |
Overhauling Of Mill Equipments In Wire Rod Mill.
|
Organisation | Rashtriya Ispat Nigam Limited,Visakhapatnam | Central Govt. Ministry/Department |
Tender Id | 2024_RINL_755620_1 |
Reference Number |
VSP/WRM/RFx No/2600008853 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | VISAKHAPATNAM |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1059032 |
Start Date | May 08, 2024 16:30 |
End Date |
15/05/2024 ( Expired 365 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Expression of interest (eoi) from reputed contractors having experience in expressway/ highway/ irrigation/ railway/ metro/ high speed rail/ power sector india/ overseas
Expression of interest (eoi) from reputed 
 contractors having experience in expressway/ 
 highway/ irrigation/ railway/ metro/ high speed
 rail/ power sector india/ overseas
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreTolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)
Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)
Read moreTolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)
Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)
Read moreSelection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Read moreConstruction of 4-lane gf western bypass from design km 0.000 (km 181.000 on nh-146) near lahdara village junction on nh-146 km 20.200 (km 223.200 on nh-44) near berkheri guru village junction on nh-44 of length-20.200 km in mp on ham.
Construction of 4-lane gf western bypass from design km 0.000 (km 181.000 on nh-146) near lahdara village junction on nh-146 km 20.200 (km 223.200 on nh-44) near berkheri guru village junction on nh-44 of length-20.200 km in mp on ham.
Read moreMaintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre
Maintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre
Read moreDevelopment, operation and maintenance of the multi modal logistics park (mmlp) hyderabad at parkibanda village in manoharabad mandal of medak district, in the state of telangana through public private partnership on dbfot basis
Development, operation and maintenance of the multi modal logistics park (mmlp) hyderabad at parkibanda village in manoharabad mandal of medak district, in the state of telangana through public private partnership on dbfot basis
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreof your Industry type