Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Btps
|
| Description |
Tggenco Btps Stage Ii Em Division Labour Charges For Cleaning Of Outer Casing Of Generators 3 4 Cleaning Of Rotor Grounding Brushes Along With Brush Holders Cleaning Of Exciter Chamber Cleaning Of 72 Nos Hvr Transformers In Es Ps 3 4 (Both Pass Ab) Top Up Of Oil Tightening Of Bolts Of Power Cable At Both Transformer End Ec Panel End Tightening Of Terminals In Transformer Cabinet Filling Of Silica Gel Arresting Of Oil Leaks Cleaning Of Sensor Processing Units Cleaning And Tightening Of Panels In Esp Control Room And Tightening Of Ct Connections At Terminal Block In 6.6 Kv 3 Ca 3 Cb 4 C 4 Cb Occ Ocd And Ocf Boards And All Other Lt Boards For The Period From 01.04.2025 To 31.03.2026
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 584869 |
|
Reference Number |
e -23 /2025-26/SE/STAGE-II/BTPS/D.No. 2213 /24-25, Dt:20.03.2025 |
| Tender Fee | 354 |
| EMD | 15000 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | March 26, 2025 01:00 |
| End Date |
Expired
07/04/2025
Expired 560 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of both end crusher roll along with cutting and welding of picks with holders before and after repairing of crusher roll at amp colliery
Repairing of both end crusher roll along with cutting and welding of picks with holders before and after repairing 
 of crusher roll at amp colliery
Read moreOutdoor type end termination of 3.3 kv ht copper cable for connection of primary side of lighting transformer to overload line by end terminating the both end of the cable along with earthing of cable of lighting transformer installed in mines of loc
Outdoor type end termination of 3.3 kv ht copper cable for connection of primary side of lighting transformer to overload line by end terminating the both end of the cable along with earthing of cable of lighting transformer installed in mines of loc
Read moreConstruction of paver road from transformer chhaka to old sdjm quarter last end both side in ward no-03 of hindol nac
Construction of paver road from transformer chhaka to old sdjm quarter last end both side in ward no-03 of hindol nac
Read moreRepairing of both end crusher roll of feeder breaker no-2 along with cutting and welding of picks with holders before and after repairing of crusher roll of muraidih, amp colliery
Repairing of both end crusher roll of feeder breaker no-2 along with cutting and welding of picks with holders before and after repairing of crusher roll of muraidih, amp colliery
Read moreRepairing of both end crusher roll of feeder breaker along with cutting and welding of picks with holders before and after repairing of crusher roll of amp colliery under barora area.
Repairing of both end crusher roll of feeder breaker 
 along with cutting and welding of picks with holders 
 before and after repairing of crusher roll of amp 
 colliery under barora area.
Read moreRepairing of both end crusher roll of feeder breaker no-2 along with cutting and welding of picks with holders before and after repairing of crusher roll of kessurgarh abocp mine of block-ii area.
Repairing of both end crusher roll of feeder breaker no-2 along with cutting and welding of picks with holders before and after repairing of crusher roll of kessurgarh abocp mine of block-ii area.
Read moreRepairing of both end crusher roll of feeder breaker no-2 along with cutting and welding of picks with holders before and after repairing of crusher roll of kessergarh abocp mine of block-ii area
Repairing of both end crusher roll of feeder breaker no-2 along with cutting and welding of picks with holders before and after repairing of crusher roll of kessergarh abocp mine of block-ii area
Read moreRepairing of 50 kva,11kv/440v transformer installed at po office ,akkocp ,providing 200 amp ictp switch and providing and fixing of suitable size cable end box of both ht and lt sides transformer of different ratings installed at akkocp substation a
Repairing of 50 kva,11kv/440v transformer installed at po office ,akkocp ,providing 200 amp ictp switch and providing and fixing of suitable size cable end box of both ht and lt sides transformer of different ratings installed at akkocp substation a
Read moreProviding and fixing of suitable size cable end box of both ht and lt sides transformer of different ratings installed at d.d mines substation and gandhi nagar substation with suitable cable glands to avoid any ingress of dust and water in respect of
Providing and fixing of suitable size cable end box of both ht and lt sides transformer of different ratings installed at d.d mines substation and gandhi nagar substation with suitable cable glands to avoid any ingress of dust and water in respect of
Read moreCurrent transformer (tfilm) test unit as following specification: 1) current injection up to 600a ac (continuous rating). 2) output current digital display range 0-600a ac with resolution of 1a. 3) digital ammeter of range of 0-10a resolution of 0.1a, with leads having crocodile clips at end. 4) output terminals should be at lhs and rhs of the kit in the front side. 5) mcb to be provided for input side protection. 6) test kit should be compact enough. note: item to be supplied along with nabl
For complete deion and other details, please refer to tender
Read moreof your Industry type