Tender Details
Particulars | Details |
---|---|
Title |
Procurement For Spares Of Inspection Window For Sluice Gate Enclosure, Bottom Ash Hopper And Nozzle Casing With Nozzle Tip Of Ceramic Lining For 8 Inch Jet Pump Assembly Of Ahp, Unit 10 And 11 Stps, Sarni.
|
Description |
Procurement For Spares Of Inspection Window For Sluice Gate Enclosure, Bottom Ash Hopper And Nozzle Casing With Nozzle Tip Of Ceramic Lining For 8 Inch Jet Pump Assembly Of Ahp, Unit 10 And 11 Stps, Sarni.
|
Organisation | Government of Madhya Pradesh |
Tender Id | 2023_MPPGC_291241_1 |
Reference Number |
PT-4351 |
Tender Fee | 500 |
EMD | 7300 |
Tender Value | |
Place | Sarni |
Link | https://mptenders.gov.in |
Start Date | August 11, 2023 20:30 |
End Date |
25/09/2023 ( Expired 623 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreNctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in a pass
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in a pass
Read moreNctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work carried out in a pass of bah
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work carried out in a pass of bah
Read moreNctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreNctps i se m ii ahp dn unit iii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit iii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreProcurement of spares for vacuum system and bottom ash crusher of ba hopper of ucc make ahp of 1x500 unit no 5 sgtps birsinghpur
Procurement of spares for vacuum system and bottom ash crusher of ba hopper of ucc make ahp of 1x500 unit no 5 sgtps birsinghpur
Read moreProcurement of spares for sam turbo make silo drain sump pump, fly ash drain pump and column assembly , casing assembly,bearing housing assembly of bottom ash overflow pump installed in ahp of ph-iv stps,sarni.
Procurement of spares for sam turbo make silo drain sump pump, fly ash drain pump and column assembly , casing assembly,bearing housing assembly of bottom ash overflow pump installed in ahp of ph-iv stps,sarni.
Read moreNctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreNctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreProcurement of various spares for indure make clinker grinder, hydro ejector and bottom ash hopper feed gate installed at ash handling system of 210 mw atps mppgcl chachai.
Procurement of various spares for indure make clinker grinder, hydro ejector and bottom ash hopper feed gate installed at ash handling system of 210 mw atps mppgcl chachai.
Read moreof your Industry type