Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Provding And Installing Three Stage Surge Supression Air Valve (For Estimation Purpose Only)
|
| Description |
Provding And Installing Three Stage Surge Supression Air Valve (For Estimation Purpose Only)
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_CEWRN_922734_2 |
|
Reference Number |
E-Quotation No.02/2023-24 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | 0 |
| Place | In the office of the Executive Engineer |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | August 28, 2023 19:50 |
| End Date |
Expired
06/09/2023
Expired 1095 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
For estimation purpose only rates for surge suppression air valve
For estimation purpose only rates for surge suppression air valve
Read morePneumatically operated rubber dam estimation purpose only
Pneumatically operated rubber dam estimation purpose only
Read moreSupplying and installation of rubber dam (only estimation purpose)
Supplying and installation of rubber dam (only estimation purpose)
Read moreMechanical componenets for lift irrigation scheme (only for estimation purpose)
Mechanical componenets for lift irrigation scheme (only for estimation purpose)
Read moreSupply, erection, testing and successfully commissioning for surge protection system comprising of bladder vessel with load cell arrangement and three stage surge supression air valves for talodhi mokasa lift irrigation scheme.
Supply, erection, testing and successfully commissioning for surge protection system comprising of bladder vessel with load cell arrangement and three stage surge supression air valves for talodhi mokasa lift irrigation scheme.
Read moreSupply, erection, testing and successfully commissioning of surge protection system comprising of bladder type vessel with load cell arrangement three stage surge suppression air valve by the undersigned.
Supply, erection, testing and successfully commissioning of surge protection system comprising of bladder type vessel with load cell arrangement, three stage surge suppression air valve by the undersigned.
Read moreMoog three stage servo valve model e079-052 with compatible pilot valve
Moog three stage servo valve model e079-052 with compatible pilot valve
Read moreSupply,errection,testing and successfully commissioning of surge protection system comprising of bladder type vessel with load cell arrangement,three stage surge suppression air valve and vaccum breaker air valve including all civil works for lis 9.
Supply,errection,testing and successfully commissioning of surge protection system comprising of bladder type vessel with load cell arrangement,three stage surge suppression air valve and vaccum breaker air valve including all civil works for lis 9.
Read moreQuotation for preparation of supply erection, testing and successfully commissioning of surge protection system comprising of minimum 15m3 bladder vessel with load cell arrangement, three stage surge suppression air valve for the project of dindora
Quotation for preparation of supply erection, testing and successfully commissioning of surge protection system comprising of minimum 15m3 bladder vessel with load cell arrangement, three stage surge suppression air valve for the project of dindora
Read moreP/f installing interlocking tiles on the space between new multi purpose hall and the back side of dept. of physical education at k.u.k (society only)
P/f installing interlocking tiles on the space between new multi purpose hall and the back side of dept. of physical education at k.u.k (society only)
Read moreof your Industry type