Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Culvert At Colony Bg Road In Eluvambadi Panchayat Polur Block Of Tiruvannamalai District Under Agamt 2 2023 To 2024
|
| Description |
Construction Of Culvert At Colony Bg Road In Eluvambadi Panchayat Polur Block Of Tiruvannamalai District Under Agamt 2 2023 To 2024
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_RDTN_347782_1 |
|
Reference Number |
Roc. No. A13-4/2845/2023Dt.22.06.202385 |
| Tender Fee | 0 |
| EMD | 4910 |
| Tender Value | |
| Place | BLOCK DEVALOPMENT OFFICE VPPOLUR |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | July 21, 2023 16:00 |
| End Date |
Expired
27/07/2023
Expired 1090 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of culvert at chinnaiya nagar in eluvambadi panchayatpolur block of tiruvannamalai district under agamt 2 2023 to 2024
Construction of culvert at chinnaiya nagar in eluvambadi panchayatpolur block of tiruvannamalai district under agamt 2 2023 to 2024
Read moreConstruction of side drainage with culvert 60 mt at puthu street in eluvambadi panchayatpolur block of tiruvannamalai district under agamt 2 2023 to 2024
Construction of side drainage with culvert 60 mt at puthu street in eluvambadi panchayatpolur block of tiruvannamalai district under agamt 2 2023 to 2024
Read moreConstruction of thrashing floor 15.50 x15 mt at adc in eluvambadi panchayatpolur block of tiruvannamalai district under agamt 2 2023 to 2024
Construction of thrashing floor 15.50 x15 mt at adc in eluvambadi panchayatpolur block of tiruvannamalai district under agamt 2 2023 to 2024
Read moreof your Industry type