Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
1st Class Brick Lining Work Of Main Canal From 1.360 Km. To 1.810 Km. At Chandrawati Pump Canal Including All Cost Of Material (Excluding Cement And Bricks), Labour, T P Used Complete In All Respects As Per Drawing Provided By Department.
|
Description |
1st Class Brick Lining Work Of Main Canal From 1.360 Km. To 1.810 Km. At Chandrawati Pump Canal Including All Cost Of Material (Excluding Cement And Bricks), Labour, T P Used Complete In All Respects As Per Drawing Provided By Department.
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_UPIDM_813646_14 |
Reference Number |
05/EE/MLCD/ VNS /2023-24 |
Tender Fee | 854 |
EMD | 26000 |
Tender Value | |
Place | EXECUTIVE ENGINEER MINOR LIFT CANAL DIVISION VNS |
Link | https://etender.up.nic.in |
Start Date | June 24, 2023 17:30 |
End Date |
04/07/2023 ( Expired 716 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Boundry wall with 2.0 normal height in brick masonary with intermediate rcc coloumn i.c. cost of all material, labour and t and p required for completion of work of new mahoi pump canal in tehsil madhogarh, jalaun (lot no.-2)
Boundry wall with 2.0 normal height in brick masonary with intermediate rcc coloumn i.c. cost of all material, labour and t and p required for completion of work of new mahoi pump canal in tehsil madhogarh, jalaun (lot no.-2)
Read moreConstruction of 1st class brick lining in main canal from km. 0.350 to 0.850 km. at korantadeeh pump canal
Construction of 1st class brick lining in main canal from km. 0.350 to 0.850 km. at korantadeeh pump canal
Read more1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material,
1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material
Read moreBrick relaying work with new 1st class brick, new brick linning with new 1st class brick, cc on bed with glass strip, cement plaster with all cost of material including labour and tool and plant etc at gokulpur pump canal in district sitapur
Brick relaying work with 40 percent new 1st class brick from chainage (0.010 to 0.200) km new brick linning with 100 percent new 1st class brick from 0.200 km to 0.600 km cc on bed with glass strip from 0.00 km to 0.600 km cement plaster from 0.00 to
Read moreBrick work with 1st class new brick and plaster on wall , brick work with 1st class new bricks, cc work in bed with glass strips , cement pointing and cement plaster on top with all cost of material including labour and tool and plant etc at manikpur
Brick work with 40 percent 1st class new brick and plaster on wall from chainage (0.050 to 0.250) km, brick work with 100 percent 1st class new brick from chainage (0.250 to 0.650) km, cc in bed with glass strips from chainage (0.050 to 0.650)
Read more1st class brick lining work with 60 percent new brick from (0.00 to 0.400) km alongwith cement pointing on both side, top of the walls and cc work in bed with glass strip from (0.00 to 0.400) km and repairing of delivery tank at rudauli pump canal in
1st class brick lining work with 60 percent new brick from (0.00 to 0.400) km alongwith cement pointing on both side, top of the walls and cc work in bed with glass strip from (0.00 to 0.400) km and repairing of delivery tank at rudauli pump canal
Read more1st class brick for lining of canal with 100 percent new brick alongwith main canal bed from chainage (0.450 to 1.00) km with all cost of material, labour, tool and plant etc as required as per drawing and boq at phagoopur pump can
1st class brick for lining of canal with 100 percent new brick alongwith main canal bed from chainage (0.450 to 1.00) km with all cost of material, labour, tool and plant etc as required as per drawing and boq at phagoopur pump canal in raibareli
Read more1st class brick lining work with 100 percent new brick from chanage (0.00 to 0.700) km along with cement plaster on both side and cc work on bed with glass strip from (0.00 to 0.700)km at adaura pump canal in district barabanki including all cost of
1st class brick lining work with 100 percent new brick from chanage (0.00 to 0.700) km along with cement plaster on both side and cc work on bed with glass strip from (0.00 to 0.700)km at adaura pump canal in district barabanki including all cost of
Read more1st class brick lining work chainage from (0.046 to 0.176)km with 40 percent new brick and (0.220 to 0.500)km with 100 percent new brick and cc work from (0.00 to .500)km in canal be at laxmanpur pump canal, district sitapur
1st class brick lining work chainage from (0.046 to 0.176)km with 40 percent new brick and (0.220 to 0.500)km with 100 percent new brick and cc work from (0.00 to .500)km in canal be at laxmanpur pump canal, district sitapur
Read moreFirst class brick lining work 1 3 cm in mawai minor from chainage 0.725 to 1.075 at kundakala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as direc
First class brick lining work 1 3 cm in mawai minor from chainage 0.725 to 1.075 at kundakala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as direc
Read moreof your Industry type