Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Illumination Of Ob Dumping And Ob Face Of Aikdocm And Gocm With 09 Nos Sm
|
| Description |
|
| Organisation | Materials Management | Ministry of Coal |
| Tender Id | GEM/2024/B/4622269 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | February 14, 2024 17:39 |
| End Date |
Expired
26/02/2024
Expired 962 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreHandling ,transport and other mining services - percentage quote based - handling service, handling & transport service, ob removal, coal extraction, hiring of equipment for removal of obr and extraction of coal by drilling, blasting and dumping at s..
Handling ,transport and other mining services - percentage quote based - handling service, handling & transport service, ob removal, coal extraction, hiring of equipment for removal of obr and extraction of coal by drilling, blasting and dumping at s..
Read moreTransportation of garbage from medchal dumping yard to jawahar nagar transfer station and kandlyakoya dumping yard (drcc) to jawahar nagar for a period of (03) months (i.e., 01/09/2026 to 30/11/2026) in medchal circle-60, quthbullapur zone, cmc. (item no.1) (completion period 3 months) (1st recall)
Transportation of garbage from medchal dumping yard to jawahar nagar transfer station and kandlyakoya dumping yard (drcc) to jawahar nagar for a period of (03) months (i.e., 01/09/2026 to 30/11/2026) in medchal circle-60, quthbullapur zone, cmc. (item no.1) (completion period 3 months) (1st recall)
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreIllumination of street light with gi octagonal pole with 30 watt led luminaries in ward no - 12, 09 and 08 and ward no - 17 and 18 within janghipurmunicipaluity under green city mission
Illumination of street light with gi octagonal pole with 30 watt led luminaries in ward no - 12, 09 and 08 and ward no - 17 and 18 within janghipurmunicipaluity under green city mission
Read moreZ.o.iv.c.no.c5/0150/2026 providing 3 nos tata ace for kodungiyur dumping ground to shift the garbage to zone ii chinnasekkadu windrow and bio cng for 90 days from div - 34 to 38, unit - 09, zone iv
Z.o.iv.c.no.c5/0150/2026 providing 3 nos tata ace for kodungiyur dumping ground to shift the garbage to zone ii chinnasekkadu windrow and bio cng for 90 days from div - 34 to 38, unit - 09, zone iv
Read moreCustom bid for services - work of supply and erection of 220 v lighting oh line along haul road and dump haul road for illumination at hoe face at bhatadi ocm bsa chandrapur area wcl as per scope of work schedule of work
Custom bid for services - work of supply and erection of 220 v lighting oh line along haul road and dump haul road for illumination at hoe face at bhatadi ocm bsa chandrapur area wcl as per scope of work schedule of work
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read more48 port layer 2 managed access switch with sfp,24 port layer 2 managed access switch with sfp,8 port layer 2 managed access switch with sfp,cat6a information outlet with base and face plate,cat6a utp cable box 305 mtr,12u rack wall mount with pdu and fan,9u rack wall mount with pdu and fan,12 core sm armoured fiber optic cable per mtr,sm fiber patch cord 3 mtr.,cat6a 24 port fully loaded patch panel,cat6a 12 port fully loaded patch panel,cat6 patch cord 0.5 mtr.,cat6 patch cord 3 mtr.,6 port fully loaded liu,24 port fully loaded liu,network controller,28320506_inverter ups 1kva ups,340104_2 kva ups,installation and commissioning of active and passive components,shifting charges 42u rack, core switch, router, fiber etc. from gm office,hdpe and fiber with digging hard soft, laying and splicing,structure cabling including suitable conduit and laying
48 port layer 2 managed access switch with sfp,24 port layer 2 managed access switch with sfp,8 port layer 2 managed access switch with sfp,cat6a information outlet with base and face plate,cat6a utp cable box 305 mtr,12u rack wall mount with pdu and fan,9u rack wall mount with pdu and fan,12 core sm armoured fiber optic cable per mtr,sm fiber patch cord 3 mtr.,cat6a 24 port fully loaded patch panel,cat6a 12 port fully loaded patch panel,cat6 patch cord 0.5 mtr.,cat6 patch cord 3 mtr.,6 port fully loaded liu,24 port fully loaded liu,network controller,28320506_inverter ups 1kva ups,340104_2 kva ups,installation and commissioning of active and passive components,shifting charges 42u rack, core switch, router, fiber etc. from gm office,hdpe and fiber with digging hard soft, laying and splicing,structure cabling including suitable conduit and laying
Read moreof your Industry type