Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Eoi For Converting Into On Grid Solar Power Plant In Place Of Already Existing Hybrid Solar Power Plant In Different Mandi Yards.
|
| Description |
Eoi For Converting Into On Grid Solar Power Plant In Place Of Already Existing Hybrid Solar Power Plant In Different Mandi Yards.
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_RKUMP_862831_1 |
|
Reference Number |
E/M/325/2023-801 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | 0 |
| Place | Kisan Mandi Bhawan, Gomti Nagar, Lko |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | November 18, 2023 14:30 |
| End Date |
Expired
04/12/2023
Expired 1044 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Disintegration of existing hybrid solar power plant and con including s/i/t/c of the same into ongrid solar power plant at different mandi yards location.
Disintegration of existing hybrid solar power plant and con including s/i/t/c of the same into ongrid solar power plant at different mandi yards location.
Read moreConverting the previously installed 20 kv solar plant to battery less at anaj mandi khargone
Converting the previously installed 20 kv solar plant to battery less at anaj mandi khargone
Read moreS/f of new equipments in place of already existing equipments in epbax system. at kisan mandi bhawan,
S/f of new equipments in place of already existing equipments in epbax system. at kisan mandi bhawan,
Read moreS/f of new equipments in place of already existing equipments in epbax system. at kisan mandi bhawan,
S/f of new equipments in place of already existing equipments in epbax system. at kisan mandi bhawan,
Read moreEoi to discover the benchmark costs of all in one all in one smart hybrid off grid smart hybrid solar street light in maharashtra
Eoi to discover the benchmark costs of all in one all in one smart hybrid off grid smart hybrid solar street light in maharashtra
Read moreConverting two bedded room to three bedded room and replacing 500w solar lighting system with dc fittings and fans into ac fittings and fans of tilang
Converting two bedded room to three bedded room and replacing 500w solar lighting system with dc fittings and fans into ac fittings and fans of tilang hostel at nila campus
Read moreConverting old non functional off grid solar power plant into grid connected solar power plant and make functional at uttarakhand gramya vikas sansthan rudarpur capacity 100 kw including5 years warantee operation and maintenance
Converting old non functional off grid solar power plant into grid connected solar power plant and make functional at uttarakhand gramya vikas sansthan rudarpur capacity 100 kw including5 years warantee operation and maintenance
Read moreEoi to discover the benchmark costs of ground roof top grid connected solar power plants with net metering with hybrid inverter with battery backup and floating solar power project including netmeter in maharashtra
Eoi to discover the benchmark costs of ground roof top grid connected solar power plants with net metering with hybrid inverter with battery backup and floating solar power project including netmeter in maharashtra
Read moreSupply and installation (including civil works) of 12 watt white led based solar street lighting system for gram panchayat kigas, banala, aut, mandi under csr
Supply and installation (including civil works) of 12 watt white led based solar street lighting system for gram panchayat kigas, banala, aut, mandi under csr
Read moreEoi for empanelment of vendors and rate contract for site survey, design, engineering, sitc and comprehensive oand m for a period of ten years of distributed hybrid gridconnected rooftop solar pv power plants with battery energy storage systems
Eoi for empanelment of vendors and rate contract for site survey, design, engineering, sitc and comprehensive oand m for a period of ten years of distributed hybrid gridconnected rooftop solar pv power plants with battery energy storage systems
Read moreof your Industry type