Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Sopd G 23 24 04 Construction Of Nh 31 To Silamahekhaiti Marketing Gate Road Including Rcc Load Bearing Drain, Brick Drain And Stone Masonry Drain And Guard Wall Under Sopd G For The Year 2023 24, Jalukbari Lac.
|
| Description |
Sopd G 23 24 04 Construction Of Nh 31 To Silamahekhaiti Marketing Gate Road Including Rcc Load Bearing Drain, Brick Drain And Stone Masonry Drain And Guard Wall Under Sopd G For The Year 2023 24, Jalukbari Lac.
|
| Organisation | Government of Assam |
| Tender Id | 2023_PWD_31340_3 |
|
Reference Number |
CE/DEV/TB/47/2023-24/5 |
| Tender Fee | 4390 |
| EMD | 4.39 Lakh |
| Tender Value | - |
| Place | O/o the Chief Engineer Roads, PWRD, Assam, |
| Link |
View Original Tender Notice
https://assamtenders.gov.in |
| Start Date | July 03, 2023 19:30 |
| End Date |
Expired
10/07/2023
Expired 1194 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreSopd_g_23_24_02 construction of rcc load bearing drain at rangmahal athgaon road under sopd-g for the year 2023-24, jalukbari lac.
Sopd_g_23_24_02 construction of rcc load bearing drain at rangmahal athgaon road under sopd-g for the year 2023-24, jalukbari lac.
Read moreKam/krc/sopd(g)/2023-24/05 improvement of dadara napara road with load bearing rcc drain under sopd-g for the year 2023-24, jalukbari lac
Kam/krc/sopd(g)/2023-24/05 improvement of dadara napara road with load bearing rcc drain under sopd-g for the year 2023-24, jalukbari lac
Read moreKam/krc/sopd(g)/2023-24/06 improvement of dadara singimari road with load bearing rcc drain under sopd-g for the year 2023-24, jalukbari lac
Kam/krc/sopd(g)/2023-24/06 improvement of dadara singimari road with load bearing rcc drain under sopd-g for the year 2023-24, jalukbari lac
Read moreSopd_g_23_24_03 improvement of pacharia college approach road with load bearing rcc drain under sopd-g for the year 2023-24, jalukbari lac.
Sopd_g_23_24_03 improvement of pacharia college approach road with load bearing rcc drain under sopd-g for the year 2023-24, jalukbari lac.
Read moreKam/krc/sopd(g)/2023-24/03 improvement of tilakchand pathar road at sualkuchi with load bearing rcc drain under sopd-g for the year 2023-24, jalukbari lac
Kam/krc/sopd(g)/2023-24/03 improvement of tilakchand pathar road at sualkuchi with load bearing rcc drain under sopd-g for the year 2023-24, jalukbari lac
Read moreKam/krc/sopd(g)/2024-25/31 ex post facto approval for construction of approach road to brahmakumari under sopd-g for the year 2023-24,jalukbari lac
Ex post facto approval for construction of approach road to brahmakumari under sopd-g for the year 2023-24,jalukbari lac
Read moreKam/krc/sopd(g)/2024-25/31 ex post facto approval for construction of approach road to brahmakumari under sopd-g for the year 2023-24,jalukbari lac
Ex post facto approval for construction of approach road to brahmakumari under sopd-g for the year 2023-24,jalukbari lac
Read moreSolar powered mdtws (1 point) at jalukbari lac under sopd-g for the year 2024-25
Solar powered mdtws (1 point) at jalukbari lac under sopd-g for the year 2024-25
Read moreSolar powered mdtws_2 points_under hajo lac under sopd-g for the year 2024-25_hajo jalukbari division_irr_amingaon
Solar powered mdtws_2 points_under hajo lac under sopd-g for the year 2024-25_hajo jalukbari division_irr_amingaon
Read moreof your Industry type