Tender Details
Particulars | Details |
---|---|
Title |
Cleaning, Testing, Adjusting Of C.I. Test Weights To 20kg For Verification And Stamping Of 3 Numbers Of Road Weigh Bridges (Wb 01, 02 And 13) Installed At Magadh Ocp M S Area
|
Description |
Cleaning, Testing, Adjusting Of C.I. Test Weights To 20kg For Verification And Stamping Of 3 Numbers Of Road Weigh Bridges (Wb 01, 02 And 13) Installed At Magadh Ocp M S Area
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_313971_1 |
Reference Number |
GM(MS)/SO(EnM)/e-NIT/24-25/38 |
Tender Fee | 0 |
EMD | 2550 |
Tender Value | |
Place | Office of the Project Officer M-S Area, Bachra |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=325374 |
Start Date | August 01, 2024 16:30 |
End Date |
10/08/2024 ( Expired 282 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing and fixing of digital load cell, digitizer and junction box for verification and re-stamping of electronic road weigh bridge no. 01 installed at rohini ocp, nk area
Providing and fixing of digital load cell, digitizer and junction box for verification and re-stamping of electronic road weigh bridge no. 01 installed at rohini ocp, nk area
Read moreCleaning, testing, and adjusting the c.i. test weights (20kg ) for annual verification and stamping of road weighbridge no. 14, capacity - 60 mt installed at ara and proposed road weighbridges 25, 26, 27 and 28, capacity 100 mt, installed at
Cleaning, testing, and adjusting the c.i. test weights (20kg ) for annual verification and stamping of road weighbridge no. 14, capacity - 60 mt installed at ara and proposed road weighbridges 25, 26, 27 and 28, capacity 100 mt, installed at
Read moreAnnual maintenance contract (amc) and repairing of 1000 nos. of ci test weights of 20kg each, for stamping of shatabdi road weigh-bridge (capacity 60 t) of barora area.
Annual maintenance contract (amc) and repairing 
 of 1000 nos. of ci test weights of 20kg each, for 
 stamping of shatabdi road weigh-bridge (capacity 
 60 t) of barora area.
Read moreSupply and installation of 02 nos. 60 kg 5.5 meter dual type rail weigh sensor along with compatible digitiser and junction box as per rdso guidelines for the rail in-motion weighbridge- 1 installed near po office of balram ocp, hingula area.
Supply and installation of 02 nos. 60 kg 5.5 meter dual type rail weigh sensor along with compatible digitiser and junction box as per rdso guidelines for the rail in-motion weighbridge- 1 installed near po office of balram ocp, hingula area.
Read moreExtension and di of existing overhead line for uninterrupted power supply arrangement in recently installed road in motion weighbridge and siding office cum security barrack of balumath siding under magadh ocp, m-s area
Extension and di of existing overhead line for uninterrupted power supply arrangement in recently installed road in motion weighbridge and siding office cum security barrack of balumath siding under magadh ocp, m-s area
Read moreCleaning, testing and painting of test weights 2550 nos. each of 20 kg to be stamped to be used during stamping of road wb no- 3 and wb no 15 under ashok ocp, ppr area .
Cleaning, testing and painting of test weights 2550 nos. each of 20 kg to be stamped to be used during stamping of road wb no- 3 and wb no 15 under ashok ocp, ppr area .
Read moreRequired for cleaning, repairing, painting, adjusting, and verification and stamping of loose hexagonal c.i test weights of ena road weighbridge-ii and kds-ii road wb under kusunda area.
Required for cleaning, repairing, painting, adjusting, and verification and stamping of loose hexagonal c.i test weights of ena road weighbridge-ii and kds-ii road wb under kusunda area.
Read moreAnnual cleaning of 14 nos weigh bridges platform with control room and under the weigh bridge structure at balram ocp under hingula area (for a period of 730 days).
Annual cleaning of 14 nos weigh bridges platform with control room and under the weigh bridge structure at balram ocp under hingula area (for a period of 730 days).
Read moreAmc of the 70no.s of air conditioner installed at various weigh bridges and of establishments for a period of 08 months under ashok ocp, piparwar area.
Amc of the 70no.s of air conditioner installed at various weigh bridges and of establishments for a period of 08 months under ashok ocp, piparwar area.
Read moreConstruction of 02 nos. high level bridges over lillari nalla (one nos. near kali mandir at chainage 0/247m of ilbl ocp and one nos. near central workshop ib valley at chainage 0/185 m) at ilbl ocp of lakhanpur area
Construction of 02 nos. high level bridges over lillari nalla (one nos. near kali mandir at chainage 0/247m of ilbl ocp and one nos. near central workshop ib valley at chainage 0/185 m) at ilbl ocp of lakhanpur area
Read moreof your Industry type