Tender Details
Particulars | Details |
---|---|
Title |
3. Renovation And Upgradation Of Modular Kitchen In 120 Men Barrack At 41st Bn, Vikram Nagar, Khurda (Odisha).
|
Description |
As Per Tender Schedule
|
Organisation | DG, Indo-Tibetan Border Police Force | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 16213 |
Tender Value | |
Place | 41 BN ITBP KHURDA(ODISHA) |
Link |
AAAAAAAAAA Login to view |
Start Date | April 28, 2025 14:30 |
End Date |
20/05/2025 ( 15 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as per
Ehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as per
Read more420/construction of cc road in front of soda factory gate at ward no. 3 nagar parishad bargawan amlai
420/construction of cc road in front of soda factory gate at ward no. 3 nagar parishad bargawan amlai
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreExpression of interest
Design, supply manufacturing, installation, testing, 
 commissioning and annual maintenance contract 
 of high capacity automated bus lifting system at 
 kk nagar bus depot in chennai
Read moreConstruction of cc roads and rcc drain
Construction of cc roads and rcc drain in ward no 12 at nagar parishad sanchi
Read moreProvision of addition / alteration and renovation works in ganga building no. 121 at dlrl, hyderabad
Provision of addition / alteration and renovation works in ganga building no. 121 at dlrl, hyderabad
Read moreM and r of bathroom renovation roof tretment and internal painting works in res no 20 at vnp officers hydel colony lucknow
M and r of bathroom renovation roof tretment and internal painting works in res no 20 at vnp officers hydel colony lucknow
Read moreRehabilitation and upgradation of nehru nagar to kothagudem section to two lane four lane with paved shoulders from km 178.500 to km 230.580 of nh 930p in the state of telangana on epc basis
Rehabilitation and upgradation of nehru nagar to kothagudem section to two lane four lane with paved shoulders from km 178.500 to km 230.580 of nh 930p in the state of telangana on epc basis
Read moreConstruction of bitumen work at sneh nagar and parwana nagar in ward no. 47
Construction of bitumen work at sneh nagar and parwana nagar in ward no. 47
Read moreInterlocking and drain slab construction work from jai bhim intersection in nagar panchayat ghosi ward no. 6 patti muhammad alias kazipura scheduled settlement to noorjahan house located at the last boundary of the ward.
Interlocking and drain slab construction work from jai bhim intersection in nagar panchayat ghosi ward no. 6 patti muhammad alias kazipura scheduled settlement to noorjahan house located at the last boundary of the ward.
Read moreof your Industry type