Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
3. Renovation And Upgradation Of Modular Kitchen In 120 Men Barrack At 41st Bn, Vikram Nagar, Khurda (Odisha).
|
Description |
As Per Tender Schedule
|
Organisation | DG, Indo-Tibetan Border Police Force | Central Govt. Ministry/Department |
Tender Id | 2025_ITBP_858012_1 |
Reference Number |
ITBP/C FTR/SHQ BBSR/ENGG/41BN/2025-04 |
Tender Fee | 0 |
EMD | 16213 |
Tender Value | |
Place | 41 BN ITBP KHURDA(ODISHA) |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=902078 |
Start Date | April 28, 2025 14:30 |
End Date |
20/05/2025 ( Expired 48 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including
Read moreOperation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Operation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Read moreConstruction of service road at katulboard from nehru nagar to urla of nh-53 from ch.309.940 to 312.250 on lhs and ch. 309.940 to 311.630 on rhs in the state of chhattisgarh
Construction of service road at katulboard from nehru nagar to urla of nh-53 from ch.309.940 to 312.250 on lhs and ch. 309.940 to 311.630 on rhs in the state of chhattisgarh
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreConstruction of additional room and repairing work on constructed sanskar bhawan at bajrang nagar geeta bawadi premises in ward no. 27 under zone no. 05
Construction of additional room and repairing work on constructed sanskar bhawan at bajrang nagar geeta bawadi premises in ward no. 27 under zone no. 05
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreDesign, supply, installation, commissioning, operation and maintenance of medical gas pipeline system at pediatrics building in burdwan mch of west bengal for 3 years and lmo pipeline connection from existing lmo plant to new manifold room
Design, supply, installation, commissioning, operation and maintenance of medical gas pipeline system at pediatrics building in burdwan mch of west bengal for 3 years and lmo pipeline connection from existing lmo plant to new manifold room
Read more8714 maint repair replacement of street light flood light highmast light garden light and other electrical allied works in mits alc dca vikram batra inf bn map area stevely carriappa enclave eme wksp sho and connected area of age emi of ge south pune
8714 maint repair replacement of street light flood light highmast light garden light and other electrical allied works in mits alc dca vikram batra inf bn map area stevely carriappa enclave eme wksp sho and connected area of age emi of ge south pune
Read moreof your Industry type