Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Concrete Pcc Work,Earth Work Cutting And Filling,5 Layer Acrylic Flooring,Basketball Poles,Basketba
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2025/R/518947 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 24, 2025 00:30 |
| End Date |
Expired
24/07/2025
Expired 447 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
ANANTH RESIDENCYANANTH RESIDENCYANANTH RESIDENCYANANTH RESIDENCYANANTH RESIDENCY...
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 10692.000 |
| bncncm | HOLYMEN | vmvmv | 10 | ₹ 288.000 |
| Test item reject | asdf-brand | Test item reject | 1000 | ₹ 49000.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 10692.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 9.900 |
| bncncm | HOLYMEN | vmvmv | 20 | ₹ 576.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 20 | ₹ 80.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 2 | ₹ 21384.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 11 | ₹ 44.000 |
| BASKETBALL RING | vixen | 460 | 1 | ₹ 999.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 2 | ₹ 990.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 10692.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 10692.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 10692.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 10692.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 2 | ₹ 1100.000 |
| BASKETBALL RING | vixen | 460 | 1 | ₹ 999.000 |
| Dell Vostro 3268 SFF - PDC G4560-4GB-1TB-NO DVD-18.5" -Linux - 3Y - WIFI - BT | Dell | Dell Vostro 3268 SFF - PDC G4560-4GB-1TB-NO DVD-18.5"-Linux - 3Y | 1 | ₹ 27040.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 11 | ₹ 44.000 |
| bncncm | HOLYMEN | vmvmv | 15 | ₹ 432.000 |
Ashpalt base,all weather synthetic 08 layer ultra cushion,basketball poles,basketball dunking ring,basketball
Ashpalt base,all weather synthetic 08 layer ultra cushion,basketball poles,basketball dunking ring,basketball
Read moreConstruction of pcc road with earth filling and rcc drain with slab from the home of harendra paswan towards the home of shankar paswan in ward no.07 of nagar panchayat karakat.
Construction of pcc road with earth filling and rcc drain with slab from the home of harendra paswan towards the home of shankar paswan in ward no.07 of nagar panchayat karakat.
Read moreCutting of grass, pruning of trees, shrub, bushes upto boundary including clearing the dry grass outside md land and filling of earth in both side of low lying area of runway at shibpur under (s) diglipur
Cutting of grass, pruning of trees, shrub, bushes upto boundary including clearing the dry grass outside md land and filling of earth in both side of low lying area of runway at shibpur under (s) diglipur
Read moreEarth filling and compaction,pcc concrete plinth,ms doors,aluminum sliding s,wall putty work,painting work,led ceiling panel light,ceiling fans,gypsum false ceiling,led tube lights,electrical wiring and distribution,painting of fabrication structure
Earth filling and compaction,pcc concrete plinth,ms doors,aluminum sliding s,wall putty work,painting work,led ceiling panel light,ceiling fans,gypsum false ceiling,led tube lights,electrical wiring and distribution,painting of fabrication structure
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreConcrete pcc work,earth work cutting and filling,5 layer acrylic flooring,basketball poles,basketba
Read more
Pcc basketball court base 100mm 32mtrsx19mtr,8 layer synthetic acrylic flooring,basketball pole one
Read more
of your Industry type