Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Strengthening Of Road (P/L Dbm And Bc On Damaged Road From Sector 37 Underpass To Sector 18 Underpass G I P Both Side On Dsc Road) Noida
|
| Description |
Strengthening Of Road (P/L Dbm And Bc On Damaged Road From Sector 37 Underpass To Sector 18 Underpass G I P Both Side On Dsc Road) Noida
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_NOIDA_817780_1 |
|
Reference Number |
14/DGM/SM(WC-2)/2023-24 |
| Tender Fee | 5310 |
| EMD | 9.94 Lakh |
| Tender Value | - |
| Place | Sr. Manager (WC-2) Sector 19 Noida |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | July 04, 2023 20:30 |
| End Date |
Expired
17/07/2023
Expired 1184 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening of road ( p/l dbm and bc work from dsc road sector-106 to sector-101 metro station in village salarpur) noida
Strengthening of road ( p/l dbm and bc work from dsc road sector-106 to sector-101 metro station in village salarpur) noida
Read moreStrengthening of road (p/l dbm, bc and mastic on road between sector-66-71 and sector-67-70 ) noida
Strengthening of road (p/l dbm, bc and mastic on road between sector-66-71 and sector-67-70 ) noida
Read moreStrengthening of road (p/l dbm and bc between sector-44 and 43 mid road and sector-96 and 97 mid road) noida
Strengthening of road (p/l dbm and bc between sector-44 and 43 mid road and sector-96 and 97 mid road) noida
Read moreM/o road (repair, reconstruction and beautification of both side damaged footpath from sector-61 underpass to mamura cut at road no.-06), noida.
M/o road (repair, reconstruction and beautification of both side damaged footpath from sector-61 underpass to mamura cut at road no.-06), noida.
Read moreStrengthening of surveillance security system work at vedvan park sec-78, mbic and noida elevated road sec-18 to sec-61, noida
Strengthening of surveillance security system work at vedvan park sec-78, mbic and noida elevated road sec-18 to sec-61, noida
Read moreStrengthening of road (p/l dgbm and bc on internal roads of a, b block and road marking paint, p/f road safety devices in sector-67) noida
Strengthening of road (p/l dgbm and bc on internal roads of a, b block and road marking paint, p/f road safety devices in sector-67) noida
Read moreM/o rsp with two-year maintenance central verge and both side rsp dsc road, sector-14 to atta sector-27 under the metro line and udhyog marg between sector-14, 15 noida
M/o rsp with two-year maintenance central verge and both side rsp dsc road, sector-14 to atta sector-27 under the metro line and udhyog marg between sector-14, 15 noida
Read moreRenovation, strengthening of the platform structure by replacement of the ruptured/damaged beams with supply and fitting/welding of additional beams with supports including repairing/welding of clits etc in both road static w/b no. 13 and 14 at hocp
Renovation, strengthening of the platform structure by replacement of the ruptured/damaged beams with supply and fitting/welding of additional beams with supports including repairing/welding of clits etc in both road static w/b no. 13 and 14 at hocp
Read moreHammer cross pein 220 grams 250 grams with handle,chuck drill 12 mm capacity with key,drills guage straight shank letter sizes a to z with guage,drills guage straight shank wire size 1 to 60 with guage,drill gauge 1 point 5 to 12 point 5 mm in steps of 0 point 5 mm,pipe mild steel ms 150nb sch 40 erw is 1239,pipe galvenized iron gi 25mm sch 40 erw,gear spur old damaged to fit 50 mm shaft dia,carrier for mounting components such as pb and relay boxes,tools bits hss 10 mm square,square engineers 6 inch 15 cm blade,rule steel 15 cm graduated both english and metric units,punch dot slot dia 10 100 mm,card file,guage belt tensioner gauge,fuel injection pump dismantling tool kit universal vice,arbor press hand operated 2 ton capacity,spindle key for opening cylinder valve,hammer sledge double faced 4 kg,multi angle magnetic clamp set metal base 18 x10 x 10 cm,welding helmet auto darkening type,table for arc welding all metal with positioner 122 cm x 92 cm x 60 cm,swagging and flooring tool kit 45 degree tubing 1 by
Hammer cross pein 220 grams 250 grams with handle,chuck drill 12 mm capacity with key,drills guage straight shank letter sizes a to z with guage,drills guage straight shank wire size 1 to 60 with guage,drill gauge 1 point 5 to 12 point 5 mm in steps of 0 point 5 mm,pipe mild steel ms 150nb sch 40 erw is 1239,pipe galvenized iron gi 25mm sch 40 erw,gear spur old damaged to fit 50 mm shaft dia,carrier for mounting components such as pb and relay boxes,tools bits hss 10 mm square,square engineers 6 inch 15 cm blade,rule steel 15 cm graduated both english and metric units,punch dot slot dia 10 100 mm,card file,guage belt tensioner gauge,fuel injection pump dismantling tool kit universal vice,arbor press hand operated 2 ton capacity,spindle key for opening cylinder valve,hammer sledge double faced 4 kg,multi angle magnetic clamp set metal base 18 x10 x 10 cm,welding helmet auto darkening type,table for arc welding all metal with positioner 122 cm x 92 cm x 60 cm,swagging and flooring tool kit 45 degree tubing 1 by
Read moreStrengthening of road (p/l dbm and bc work from atta underpass to sector-61 underpass on m.p.-2 road) noida.
Strengthening of road (p/l dbm and bc work from atta underpass to sector-61 underpass on m.p.-2 road) noida.
Read moreof your Industry type