Tender Details
Particulars | Details |
---|---|
Title |
Maintenance Of Shahdara Outfall Drain By Removing Of Msw, Floating Material, Jungle Grass, Shrubs, Hycinath Etc From Rd 0m To 5800 M For Duration Of 6 Months.
|
Description |
Maintenance Of Shahdara Outfall Drain By Removing Of Msw, Floating Material, Jungle Grass, Shrubs, Hycinath Etc From Rd 0m To 5800 M For Duration Of 6 Months.
|
Organisation | Irrigation and Flood Control | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 95329 |
Tender Value | |
Place | Delhi |
Link |
AAAAAAAAAA Login to view |
Start Date | April 20, 2025 00:25 |
End Date |
25/04/2025 ( 5 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair and servicing of h.r. gates of osp left bank canal from rd 26.275 km to rd 35.150 km under nd division no 08 sanawad at nd e/m sub division no. 31 sanawad, district khargone including material, labour charges and testing etc. complete work.
Repair and servicing of h.r. gates of osp left bank canal from rd 26.275 km to rd 35.150 km under nd division no 08 sanawad at nd e/m sub division no. 31 sanawad, district khargone including material, labour charges and testing etc. complete work.
Read moreEstimate for internal clearance of outfall link drain from rd 2800 to 0 before flood season 2025
Estimate for internal clearance of outfall link drain from rd 2800 to 0 before flood season 2025 (the tender is open for contractors/agencies/societies)
Read moreRestoration/maintenance of various roads by way of slips /drain clearance, constt.of created walls etc. for the year 2025-26 of followings roads (stage contract) samote to targian and 3 others
Restoration/maintenance of various roads by way of slips /drain clearance, constt.of created walls etc. for the year 2025-26 of followings roads (stage contract) samote to targian and 3 others
Read moreMaintenance of shahdara outfall drain by removing of msw, floating material, jungle grass, shrubs, hycinath etc from rd 0m to 5800 m for duration of 6 months.
Maintenance of shahdara outfall drain by removing of msw, floating material, jungle grass, shrubs, hycinath etc from rd 0m to 5800 m for duration of 6 months.
Read moreRemoval of obstruction and cleaning of kushak drain from ina metro station to kushak bus depot upstream and maintenance for a period of six months.
Removal of obstruction and cleaning of kushak drain from ina metro station to kushak bus depot upstream and maintenance for a period of six months.
Read moreMaintenance of n.g. drain free from hyacinth, patera, elephant grass, floating material grass or any other water plant and keep the surface of water in the drain clean from one end to other end by mannual / mechinacal means (by deploying weed harvest
Maintenance of n.g. drain free from hyacinth, patera, elephant grass, floating material grass or any other&#x0d water plant and keep the surface of water in the drain clean from one end to other end by mannual / mechinacal means
Read moreMtc. of road from balanoncherra to joymoni para under jamupui hill sub-division during the year 2025-26 sh-pot holes repair, tack coat, carpeting, seal coating, surface drain, drain maintenance and jungle clearing etc.
Mtc. of road from balanoncherra to joymoni para under jamupui hill sub-division during the year 2025-26 sh-pot holes repair, tack coat, carpeting, seal coating, surface drain, drain maintenance and jungle clearing etc.
Read moreMaintenance of road from td road to chowkidar para at ch.0.90km under damcherra sub division, pwd r and b during the year 2025 2026 sh construction of 2.00 m 3.00 m cross drain, wing walls, retaining walls, subway etc.
Maintenance of road from td road to chowkidar para at ch.0.90km under damcherra sub division, pwd r and b during the year 2025 2026 sh construction of 2.00 m 3.00 m cross drain, wing walls, retaining walls, subway etc.
Read moreDisposal of silt from rd 0m to rd 3900m of trunk drain - ii for the year 2025.
Disposal of silt from rd 0m to rd 3900m of trunk drain - ii for the year 2025.
Read moreAr mo drains
Removal of obstructions from the bed of bakkarwala outfall drain from rd 0m to rd 3646m including maintenance of entire length of drain, for a period of nine months of keep it free from obstructions
Read moreof your Industry type