Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Epoxy Resin With Hardner
|
| Description |
Epoxy Resin With Hardner As Per Tre 195
|
| Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
| Tender Id | 2024_BHEL_33163_1 |
|
Reference Number |
E7233337 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | BHEL BHOPAL |
| Link |
View Original Tender Notice
https://eprocurebhel.co.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=34688 |
| Start Date | February 19, 2024 23:30 |
| End Date |
Expired
21/02/2024
Expired 964 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of strong acid cation exchange resin and strong base anion exchange resin for dm plant
Supply of strong acid cation exchange resin and strong base anion exchange resin for dm plant
Read moreProcurement of resin capsules for use at alp mine
Procurement of resin capsules for use at alp mine
Read moreProcurement of encon make high efficiency energy saving e-glass epoxy frp blades for main idct at stpp, jaipur, mancherial, telangana.
Procurement of encon make high efficiency energy saving e-glass epoxy frp blades for main idct at stpp, jaipur, mancherial, telangana.
Read moreTggenco-ktpp-ii-em-repair and rectification of 4600 kva, 11/4.1kv, m/s.bhel make dry type cast resin vfd transformer, vector group dyn11 (sl.no.2035033) of ktpp stage-ii
Tggenco-ktpp-ii-em-repair and rectification of 4600 kva, 11/4.1kv, m/s.bhel make dry type cast resin vfd transformer, vector group dyn11 (sl.no.2035033) of ktpp stage-ii
Read moreOn-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreof your Industry type