Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Storage And Segregation Shed (Decentralised Swm Unit) Under Sbm Fund Under Tiluri Gp
|
Description |
Construction Of Storage And Segregation Shed (Decentralised Swm Unit) Under Sbm Fund Under Tiluri Gp
|
Organisation | Zilla Parishad | State Govt. and UT |
Tender Id | 2025_ZPHD_866716_1 |
Reference Number |
NIeT-05/ 2025-26 of Tiluri GP |
Tender Fee | 1000 |
EMD | 6982 |
Tender Value | |
Place | TILURI GP AREA |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1948029 |
Start Date | June 19, 2025 22:30 |
End Date |
27/06/2025 ( Expired 21 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design construction testing commissioning and operation and maintenance of infrastructure works at integrated manufacturing cluster khurpia uttarakhand
Design construction testing commissioning and operation maintenance of infrastructure works at integrated manufacturing cluster khurpia uttarakhand under amritsar kolkata industrial corridor on epc basis
Read moreNon comprehenssive biennial rate contract for di dr of epm alternator of under
Non comprehenssive biennial rate contract for di dr of epm alternator of under
 construction boat sm6 and commissioned boats having mdl d448/gds liabilities
 project p75
Read moreReplacement of goose neck panel and bends (under capex 2025-26), rear water wall panel and overhauling of boiler pr. parts at unit #3, ktps.
Replacement of goose neck panel and bends (under capex 2025-26), rear water wall panel and overhauling of boiler pr. parts at unit #3, ktps.
Read moreConstruction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss kumher (distt.-bharatpur) on turnkey basis under bn-9018002522
Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss kumher (distt.-bharatpur) on turnkey basis under bn-9018002522
Read moreConstruction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipur north) with installation of opgw network on existing line including survey, supply under bn-9018002521
Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipur north) with installation of opgw network on existing line including survey, supply under bn-9018002521(turnkey)
Read moreCompletion of incomplete works for construction of otm accn for women mps and construction of one rcc covered under ground water sump of 1.10 lakh gallon capacity at fort willam under ge(fw) kolkata
Completion of incomplete works for construction of otm accn for women mps and construction of one rcc covered under ground water sump of 1.10 lakh gallon capacity at fort willam under ge(fw) kolkata
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreDesign and construction of provn of md accn for 736 dus 82 jcos and 654 ors out of 1150 dus ph iii of three phs at panagarh mil stn under ge p panagarh on engineering procurement and construction epc mode
Design and construction of provn of md accn for 736 dus 82 jcos and 654 ors out of 1150 dus ph iii of three phs at panagarh mil stn under ge p panagarh on engineering procurement and construction epc mode
Read moreConstruction of two no. of pile foundations, one normal foundation, tower erection and stringing activities in addition to dismantling and de-string work of required portion of 400kv (tripple snowbird) rajarhat-purnea transmission line at the ganga river crossing, bakia diyara, appx 15km away from pirpenti (bhagalpur) under kahalgaon tlm office of er-i.
Construction of two no. of pile foundations, one normal foundation, tower erection and stringing activities in addition to dismantling and de-string work of required portion of 400kv (tripple snowbird) rajarhat-purnea transmission line at the ganga river crossing, bakia diyara, appx 15km away from pirpenti (bhagalpur) under kahalgaon tlm office of er-i.
Read moreOverhauling of hp valves and servicing of actuators of unit#3 under bm dept.
Overhauling of hp valves and servicing of actuators of unit#3 under bm dept.
Read moreof your Industry type