Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Strengthening Of The Damaged Road Industrial Area Phase 3 Raipur Kalan Chandigarh
|
| Description |
Strengthening Of The Damaged Road Industrial Area Phase 3 Raipur Kalan Chandigarh
|
| Organisation | Chandigarh Administration | State Govt. and UT |
| Tender Id | 2024_CHD_78937_1 |
|
Reference Number |
CP2Road287-98 |
| Tender Fee | 0 |
| EMD | 2.42 Lakh |
| Tender Value | - |
| Place | Chandigarh |
| Link |
View Original Tender Notice
https://etenders.chd.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=97391 |
| Start Date | January 25, 2024 00:25 |
| End Date |
Expired
31/01/2024
Expired 942 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair road cut paver cut for the work of strengthening tertiary treated water supply system and laying of tt water line from bhaskar chowk to dumping ground ut chandigarh
Repair road cut paver cut for the work of strengthening tertiary treated water supply system and laying of tt water line from bhaskar chowk to dumping ground ut chandigarh
Read moreProviding alternate power source to adinarayana hosahalli industrial area, phase-2, doddaballapura taluk, bengaluru rural district.
Providing alternate power source to adinarayana hosahalli industrial area, phase-2, doddaballapura taluk, bengaluru rural district.
Read moreIt addl. pune infotech park i industrial area. m and r to rgibp industrial area, hinjawadi. annual maintenance of cctv surveillance system network in rgibp phase i, ii and iii.
It addl. pune infotech park i industrial area. m and r to rgibp industrial area, hinjawadi. annual maintenance of cctv surveillance system network in rgibp phase i, ii and iii.
Read moreP/f of ms grating by replacing damaged rcc road gully grating being heavy loaded vehicular traffic to pass out swd on entry point of each gali no. 1 to 4, gobindpura and gali no. 5 of thakurdwara under the charge of sde mcph-20, chandigarh
P/f of ms grating by replacing damaged rcc road gully grating being heavy loaded vehicular traffic to pass out swd on entry point of each gali no. 1 to 4, gobindpura and gali no. 5 of thakurdwara under the charge of sde mcph-20, chandigarh
Read moreProviding consultancy services for preparation of detailed project report (dpr) for the formation of new industrial areas including economic analysis, surveying, layout plan design, preparation of cost estimates, cost structure etc., for the proposed mulwada 4th & 5th phase industrial area, belagavi district. (extent 487acres 39 guntas).
Providing consultancy services for preparation of detailed project report (dpr) for the formation of new industrial areas including economic analysis, surveying, layout plan design, preparation of cost estimates, cost structure etc., for the proposed mulwada 4th & 5th phase industrial area, belagavi district. (extent 487acres 39 guntas).
Read moreProviding 11 kv mcvcb breaker and allied equipment at 220/66/11kv receiving station, doddaballapura for arranging power supply to cetp at kiadb apparel park phase-1 industrial area, doddaballapura taluk, bengaluru rural district.
Providing 11 kv mcvcb breaker and allied equipment at 220/66/11kv receiving station, doddaballapura for arranging power supply to cetp at kiadb apparel park phase-1 industrial area, doddaballapura taluk, bengaluru rural district.
Read moreEstablishment, commissioning of 6.0mld regional combined sewage & effluent treatment facility (rcsetf) civil/common infrastructure installed treatment machinery zero liquid discharge (zld) on turnkey basis including operation & maintenance of entire plant for a period of 5 years at mundargi 4th phase industrial area, ballari district.
Establishment, commissioning of 6.0mld regional combined sewage & effluent treatment facility (rcsetf) civil/common infrastructure installed treatment machinery zero liquid discharge (zld) on turnkey basis including operation & maintenance of entire plant for a period of 5 years at mundargi 4th phase industrial area, ballari district.
Read morePeriodical assistance for the various works of warehouse no 1 2 3 c go down diesel bunk scrap yard cpri bhel stores building and other storage area for a period of 12 months
Periodical assistance for the various works of warehouse no 1,2,3, c-go down, diesel bunk, scrap yard ,cpri, bhel stores building and other storage area for a period of 12 months
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreof your Industry type