Tender Details

About Tender

🏭 Procurement Opportunity: Replacement Of Gi Pipe For Pumping Line At Nehu, Shillong 🛢️ North Eastern Hill University (Nehu), Under The Aegis Of The Central Government's Ministry/Department, Is Seeking Bids For The Replacement Of The Existing Gi Pipe For The Pumping Line From Wahshallainai Pump House To Stage I Reservoir Near The Old P Type Quarters At The Permanent Campus In Shillong. 📅 Bid Submission Deadline: May 09, 2024, 12:00 Pm Tender Fee: Inr 500 Earnest Money Deposit (Emd): Inr 16,000 Interested Bidders Must Possess The Necessary Qualifications And Experience To Undertake This Project. Proposals Should Include Detailed Technical Specifications, Cost Estimates, And A Timeline For Project Completion. Keywords: Gi Pipe, Pumping Line, Nehu, Shillong, Infrastructure Project, Government Tender, Bid Submission, Emd, Tender Fee
Particulars Details
Title
Replacement With New Gi Pipe For Pumping Line From Wahshallainai Pump House To Stage I Reservoir Nar Old P Type Quarters At Permanent Campus, Nehu, Shillong.
Description
Replacement With New Gi Pipe For Pumping Line From Wahshallainai Pump House To Stage I Reservoir Nar Old P Type Quarters At Permanent Campus, Nehu, Shillong.
Organisation North-Eastern Hill University (NEHU) | Central Govt. Ministry/Department
Tender Id 2024_NEHU_804962_1
Reference
Number
CD/ESTM/4264/2023-62 dated-25/04/2024
Tender Fee 500
EMD 16000
Tender Value
Place NEHU, Shillong.
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=846085
Start Date April 26, 2024 15:30
End Date

09/05/2024 ( Expired 379 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Electrical works associated with 02 nos 20 hp pump motor (new) power connection from er panel to terminal box at balarampur pump house, iit kharagpur

Electrical works associated with 02 nos 20 hp pump motor (new) power connection from er panel to terminal box at balarampur pump house, iit kharagpur

Read more
Reusing the existing gi pipes of the old high rise net house stricture to construct new nursery required shade net house at block-i nursery area (new shade net house size 25 mt x 30 mt x side height 2.5 mt) at nursery block-i at icar-iihr, bengalur

Reusing the existing gi pipes of the old high rise net house stricture to construct new nursery required shade net house at block-i nursery area (new shade net house size 25 mt x 30 mt x side height 2.5 mt) at nursery block-i at icar-iihr, bengalur

Read more
Procurement of structural steel for installation of platform with hand railing along the pipe rack of asdl from stage-ii pump house, capex 25-26.

Procurement of structural steel for installation of platform with hand railing along the pipe rack of asdl from stage-ii pump house, capex 25-26.

Read more
Replacement of rusted gi pipes into ppr pipes from no 3 pump house to yashpal family line qtrs and arps at artcs, diphu (assam)

Replacement of rusted gi pipes into ppr pipes from no 3 pump house to yashpal family line qtrs and arps at artcs, diphu (assam)

Read more
Replacement of blockage water supply pipe line including fittings for big studio and construction of cc road for connection of pump room, deep tube well etc to main road at srfti, kolkata

Replacement of blockage water supply pipe line including fittings for big studio and construction of cc road for connection of pump room, deep tube well etc to main road at srfti, kolkata

Read more
Replacement of old unserviceable gi/ci pipe line with connected items at hq 32 inf bde, ph nos 5 and ph-10 area under age e/m (ws) of ge (u) meerut cantt.

Replacement of old unserviceable gi/ci pipe line with connected items at hq 32 inf bde, ph nos 5 and ph-10 area under age e/m (ws) of ge (u) meerut cantt.

Read more
Replacement of old damaged 100mm dia ci line

Replacement of old damaged 100mm dia ci line with new 100mm dia di water supply line from h.no.10-4-771/718 to h.no.10-4-11/11/a at masjid e hasan, mg nagar to rectify polluted water supply complaints under chintal basthi section, sd-ii, division-iii

Read more
A r and m o water supply under sub-division-ii, cd, apwd, diglipur during 2025-26. sw- laying of pumping line for newly installed 72 hp pump from machi culvert pump house to swarajgram treatment plant

A r and m o water supply under sub-division-ii, cd, apwd, diglipur during 2025-26. sw- laying of pumping line for newly installed 72 hp pump from machi culvert pump house to swarajgram treatment plant

Read more
1st class brick for lining of canal with 100 percent new brick alongwith main canal bed from chainage (0.450 to 1.00) km with all cost of material, labour, tool and plant etc as required as per drawing and boq at phagoopur pump can

1st class brick for lining of canal with 100 percent new brick alongwith main canal bed from chainage (0.450 to 1.00) km with all cost of material, labour, tool and plant etc as required as per drawing and boq at phagoopur pump canal in raibareli

Read more
Tender for prov. 11 kv hht line along with new 3 ph. lt line and 1 ph. lt line from prop. 11/0.4 kv, 100 kva s.stn. to energize 15 nos. t/well at vill. kuthiari in (e) section amb - 2nd under electrical sub division hpsebl amb.

Tender for prov. 11 kv hht line along with new 3 ph. lt line and 1 ph. lt line from prop. 11/0.4 kv, 100 kva s.stn. to energize 15 nos. t/well at vill. kuthiari in (e) section amb - 2nd under electrical sub division hpsebl amb.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise