Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling Of Damage Deck Plate, Idler Frame With Roller, Installation And Erection Of Same Fabrication And Erection Of Deck Plates Of Unit No. 1401 Belt Conveyor Of Drive Side Of Loading Section At Madhuban Coal Washery Under Block Ii Area, Bccl
|
| Description |
Dismantling Of Damage Deck Plate, Idler Frame With Roller, Installation And Erection Of Same Fabrication And Erection Of Deck Plates Of Unit No. 1401 Belt Conveyor Of Drive Side Of Loading Section At Madhuban Coal Washery Under Block Ii Area, Bccl
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_BCCL_286056_1 |
|
Reference Number |
BCCL/PO/MCW/E-TENDER/ 2023-24/073 |
| Tender Fee | - |
| EMD | 3445 |
| Tender Value | - |
| Place | MADHUBAN COAL WASHERY |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | August 16, 2023 14:30 |
| End Date |
Expired
24/08/2023
Expired 1147 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing and maintenance of over head line 6.6 kv power from existing madhuban coal washery to newly proposed 5.0 mtpa madhuban nlw coal washery under block-ii area, bccl.
Repairing and maintenance of over head line 6.6 kv power from existing madhuban coal washery to newly proposed 5.0 mtpa madhuban nlw coal washery under block-ii area, bccl.
Read moreRepairing, overhauling of ps-8 and loading section 02 mva transformer make - ngef, 6.6 kv to 433v at madhuban coal washery under block-ii area, bccl.
Repairing, overhauling of ps-8 and loading section 02 mva transformer make - ngef, 6.6 kv to 433v at madhuban coal washery under block-ii area, bccl.
Read moreRepairing, overhauling of vibrating screen gear box assembly of unit 910-1 and 913-3 of ps-9 section at madhuban coal washery under block-ii area, bccl.
Repairing, overhauling of vibrating screen gear box assembly of unit 910-1 and 913-3 of ps-9 section at madhuban coal washery under block-ii area, bccl.
Read moreRepairing and replacement of worn out spare of ps-1 sump pump i.e. head shaft, impeller, tt joint and bush of rom section at madhuban coal washery under block-ii area, bccl.
Repairing and replacement of worn out spare of ps-1 sump pump i.e. head shaft, impeller, tt joint and bush of rom section at madhuban coal washery under block-ii area, bccl.
Read moreComplete repairing, overhauling of 6.6kv, 1250 amps ngef make ps-24, ps-9, ps-8 and loading section low oil circuit breaker with its panel in loading section at madhuban coal washery under block-ii area, bccl.
Complete repairing, overhauling of 6.6kv, 1250 amps ngef make ps-24, ps-9, ps-8 and loading section low oil circuit breaker with its panel in loading section at madhuban coal washery under block-ii area, bccl.
Read moreReplacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Read moreDismantling of damaged deck plates, idler frame with rollers, installation and erection of same fabrication and erection of deck plates of unit no. 1404 conveyor tale end side of loading section at madhuban coal washery under block-ii area, bccl .
Dismantling of damaged deck plates, idler frame with rollers, installation and erection of same fabrication and erection of deck plates of unit no. 1404 conveyor tale end side of loading section at madhuban coal washery under block-ii area, bccl .
Read moredismantling of damaged deck plates, idler frame with rollers, return rollers , installation erection of same and fabrication and erection of deck plates of unit no. 201 ps-2 belt conveyor tail end side of rom section at madhuban coal washery under
dismantling of damaged deck plates, idler frame with rollers, return rollers , installation erection of same and fabrication and erection of deck plates of unit no. 201 ps-2 belt conveyor tail end side of rom section at madhuban coal washery under
Read moreReplacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1404 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1404 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Read morereplacement of worn out intermediate frame and deck plates, installation of idler frame with rollers, fabrication and erection of same at 401 middle portion of belt conveyor rom section at madhuban coal washery under block-ii area, bccl
replacement of worn out intermediate frame and deck plates, installation of idler frame with rollers, fabrication and erection of same at 401 middle portion of belt conveyor rom section at madhuban coal washery under block-ii area, bccl
Read moreof your Industry type