Tender Details

Particulars Details
Title
Construction Of Balance Bfl Work Along Ibb From Bp No. 2063/1 S To 2063/10 S Of Length 0.90 Km In The Aor Of Bop Kalsimura In The State Of Tripura
Description
Construction Of Balance Bfl Work Along Ibb From Bp No. 2063/1 S To 2063/10 S Of Length 0.90 Km In The Aor Of Bop Kalsimura In The State Of Tripura
Organisation National Projects Construction Corporation Limited | Public Sector Undertakings
Tender Id 2024_NPCC_186396_1
Reference
Number
NPCC/NEZ/GHY/BFL/KALSIMURA/38
Tender Fee 2950
EMD 1.51 Lakh
Tender Value
Place Tripura
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=203981
Start Date February 16, 2024 15:30
End Date

22/02/2024 ( Expired 424 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.

Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.

Read more
Engaging technical consultant for preparation of fs and dpr and providing pre-construction activities for erection of fence and construction of track along the fence of imb between bp-168 to bp-175 (length - 74.70 km) including constr of approach rd

Engaging technical consultant for preparation of fs and dpr and providing pre-construction activities for erection of fence and construction of track along the fence of imb between bp-168 to bp-175 (length - 74.70 km) including constr of approach rd

Read more
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Read more
Construction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra

Construction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra

Read more
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.

Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.

Read more
Preparation of detailed project report, pre construction activity and supervision for the work of elevated flyover in dhanbad town from km-53(dhansar) on (nh-218) to govindpur on nh-19 (old nh-2) in the state of jharkhand

Preparation of detailed project report, pre construction activity and supervision for the work of elevated flyover in dhanbad town from km-53(dhansar) on (nh-218) to govindpur on nh-19 (old nh-2) in the state of jharkhand

Read more
Pbmc work from km 0.000 to km 59.60 of nh_112_old nh-35_under nh division no. v in the district of north 24 parganas west bengal. job no. pbmc_112_wb_2024_25_562.

Pbmc work from km 0.000 to km 59.60 of nh_112_old nh-35_under nh division no. v in the district of north 24 parganas west bengal. job no. pbmc_112_wb_2024_25_562.

Read more
Construction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police

Construction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police

Read more
Sc services for strengthening or overlay and operation and maintenance work on kota baran section of nh 27 from km 1080.263 to km 1184.322 (length 104.059 km) in the state of rajasthan

Sc services for strengthening or overlay and operation and maintenance work on kota baran section of nh 27 from km 1080.263 to km 1184.322 (length 104.059 km) in the state of rajasthan

Read more
Cement concrete lining work by paver machine in balance reaches between 103.50 km to 124.00 km (8.76 km. length) of rmc cad anta

Cement concrete lining work by paver machine in balance reaches between 103.50 km to 124.00 km (8.76 km. length) of rmc cad anta

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise