Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Reconstruction Of Boundary At Vivekananda More (Traffic Rottary) At Mangalbari Under Ward No. Xii And Xviii
|
| Description |
Civil Works
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_MAD_542978_1 |
|
Reference Number |
11 of Chairman/OMM/2023-24 (2nd call) date14/06/23 |
| Tender Fee | 0 |
| EMD | 2850 |
| Tender Value | - |
| Place | Old Malda Municipality |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | June 20, 2023 19:30 |
| End Date |
Expired
28/06/2023
Expired 1203 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Reconstruction of boundary wall road and drain of extended swmf area
Reconstruction of boundary wall road and drain of extended swmf area at nrb,barc,tarapur
Read moreReconstruction of collapsed & damaged boundary wall at different locations of periphery and strengthening of tilted boundary wall near tali of kajra solar plant, lakhisarai.
Reconstruction of collapsed & damaged boundary wall at different locations of periphery and strengthening of tilted boundary wall near tali of kajra solar plant, lakhisarai.
Read moreReconstruction of collapsed boundary wall at rcp 5, chainage 209.75 km of prrpl in jatni sambalpur section
Reconstruction of collapsed boundary wall at rcp 5, chainage 209.75 km of prrpl in jatni sambalpur section
Read moreWork related to the reconstruction of the boundary wall of the iert institute located on rampriya road.
Work related to the reconstruction of the boundary wall of the iert institute located on rampriya road.
Read moreReconstruction of the damaged boundary wall from gate no. 1 of airport enclave to gagol road at shatabdinagar.
Reconstruction of the damaged boundary wall from gate no. 1 of airport enclave to gagol road at shatabdinagar.
Read moreM/o park (reconstruction of footpath and beautification of front boundary wall and gate, grit wash of boundary wall and fencing concertina coil near jhuggi in shaheed park sector-31) noida.
M/o park (reconstruction of footpath and beautification of front boundary wall and gate, grit wash of boundary wall and fencing concertina coil near jhuggi in shaheed park sector-31) noida.
Read moreWidening and strengthening/reconstruction work of barganda chowk to college more via power house road (length - 2.715 km.) for the year 2026-27 under road division, giridih
Widening and strengthening/reconstruction work of barganda chowk to college more via power house road (length - 2.715 km.) for the year 2026-27 under road division, giridih
Read moreMiscellaneous civil works alongwith checking of leakage at tax building and reconstruction of boundary wall at cto compound building, under varanasi oa
Miscellaneous civil works alongwith checking of leakage at tax building and reconstruction of boundary wall at cto compound building, under varanasi oa
Read moreM/o park (reconstruction of footpath and r/o boundary wall in ragini park in barola and a and b block park sector-49) noida.
M/o park (reconstruction of footpath and r/o boundary wall in ragini park in barola and a and b block park sector-49) noida.
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreof your Industry type