Tender Details
Particulars | Details |
---|---|
Title |
Alloy Steel Rod Dia 505(+ 2) Mm In Multiple Length Of 90(+ 5/ 0) To Specn. Scm4, In Annealed, Skin
|
Description |
|
Organisation | Department of Defence Production | Ministry of Defence |
Tender Id | GEM/2025/B/6174759 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | April 26, 2025 20:34 |
End Date |
06/05/2025 ( Expired 17 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreOne time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
One time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreConsultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Read moreRepairs to 32 mm 65 mm dia hand pumps in barshi city and replacing hand pum stand of 100 mm and 150 mm dia hand pumps
Repairs to 32 mm 65 mm dia hand pumps in barshi city and replacing hand pum stand of 100 mm and 150 mm dia hand pumps
Read moreUpgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Read moreSupply, erection, testing, commissioning for 5 x 250 kva sub-stations alongwith lt extension, erection of 5 no isolation point and laying of ht xlpe cable 120 mm sq on 9m st pole at smgs hospital for ac system in ward no 1, 2, 3, 16 , 20 under ed-
Supply, erection, testing, commissioning for 5 x 250 kva sub-stations alongwith lt extension, erection of 5 no isolation point and laying of ht xlpe cable 120 mm sq on 9m st pole at smgs hospital for ac system in ward no 1, 2, 3, 16 , 20 under ed-
Read moreProviding pole shifting in construction of basoda ring road (by pass) from new mandi bereth road to mewli via syawada ganj, rajoda , chourawara pachama mahagour rc length 23.80 km. (phase -2) ganjbasoda dist vidisha
Providing pole shifting in construction of basoda ring road (by pass) from new mandi bereth road to mewli via syawada ganj, rajoda , chourawara pachama mahagour rc length 23.80 km. (phase -2) ganjbasoda dist vidisha
Read moreof your Industry type