Tender Details
About Tender
🏗️ Invitation For Landslide Treatment Work On Nh 58 🏔️ The Ministry Of Road Transport And Highways, Under The Central Government, Invites Tenders From Experienced Contractors For The Execution Of Landslide Treatment Work On Nh 58 From Km 235.420 (Shivpuri) To Km 266.130 (Kodiyata) In The State Of Uttarakhand, Under The Engineering, Procurement, And Construction (Epc) Mode. 📅 Bid Submission Deadline: May 20, 2024, 12:00 Pm Tender Fee: Inr 11,800 Earnest Money Deposit (Emd): Inr 10,95,000 This Project Involves The Treatment Of 12 Landslide Prone Locations And Requires A Contractor With A Proven Track Record In Similar Infrastructure Projects. Interested Parties Should Submit Detailed Bids, Including Technical And Financial Proposals, By The Specified Deadline. Keywords: Landslide Treatment, Nh 58, Uttarakhand, Epc Mode, Infrastructure Project, Ministry Of Road Transport And Highways, Tender, Bid Submission, Earnest Money DepositParticulars | Details |
---|---|
Title |
Landslide Treatment Work Of 12 Location On Nh 58 From Km 235.420 (Shivpuri) To Km 266.130 (Kodiyata) Under Epc Mode In The State Of Uttarakhand On Epc Mode.
|
Description |
Landslide Treatment Work Of 12 Location On Nh 58 From Km 235.420 (Shivpuri) To Km 266.130 (Kodiyata) Under Epc Mode In The State Of Uttarakhand On Epc Mode.
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id | 2024_MoRTH_800365_1 |
Reference Number |
1191/13Yata-NH-10/2024 dated 13.03.2024 |
Tender Fee | 11800 |
EMD | 1.1 Crore |
Tender Value | |
Place | NH-58 |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=841332 |
Start Date | April 08, 2024 17:30 |
End Date |
28/05/2024 ( Expired 378 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreConst of realignment of nh87 new nh109 sec of rudrapur kathgodam ch.0.000 (exist km 54.050 of nh 87 to ch.7.875 exis km61.550 of nh 87 due to proposed expansion of pantnagar airport l7.875 km in uttarakhand in epc mode
Const of realignment of nh87 new nh109 sec of rudrapur kathgodam ch.0.000 (exist km 54.050 of nh 87 to ch.7.875 exis km61.550 of nh 87 due to proposed expansion of pantnagar airport l7.875 km in uttarakhand in epc mode
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreConsultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.
Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.
Read moreConstr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Read moreof your Industry type