Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Internal Clearance Of Jungle, Weed Grass From Rd 0 M 5 F 2 M 2 F And Silt Clearance From 0 M 0 M 5 F Of Dudoli Minor And From 17 M 4 F 300 To 20 M Of Hathin
|
Description |
Internal Clearance Of Jungle, Weed Grass From Rd 0 M 5 F 2 M 2 F And Silt Clearance From 0 M 0 M 5 F Of Dudoli Minor And From 17 M 4 F 300 To 20 M Of Hathin
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2025_HRY_450024_1 |
Reference Number |
2025B4F58BD4 1161 4C81 9D40 A2A090F7C336164IRR |
Tender Fee | 1680 |
EMD | 3000 |
Tender Value | |
Place | BAHIN |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=527566 |
Start Date | May 31, 2025 16:40 |
End Date |
05/06/2025 ( Expired 26 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement to ghodar minor from rd 00 m to 106 m and 200m to 529.80 m by providing c.c. trough wall off-taking at rd 12450.00 m. (l) of siriol main canal under tip for the year 2025-26.
Improvement to ghodar minor from rd 00 m to 106 m and 200m to 529.80 m by providing c.c. trough wall off-taking at rd 12450.00 m. (l) of siriol main canal under tip for the year 2025-26.
Read moreProviding and erection of w metal beam crash barrier along sundernagar hydal channel service road (both sides) from bcw (rd 80 mtr) to silt ejector bsl (p) bbmb sundernagar.
Providing and erection of w metal beam crash barrier along sundernagar hydal channel service road (both sides) from bcw (rd 80 mtr) to silt ejector bsl (p) bbmb sundernagar.
Read moreOperation and maintenance
I and cadd srsp-i o and m jungle clearance and silt removal from km.0.000 to km.24.500 for 1r-dbm-31-srsp-i canal from damera village, damera mandal to pedhakodepaka village, shayampet mandal, hanumakonda district
Read moreInternal clearance of pai disty from rd 1600 to 42200 before kharif 2025.
Estimate for internal clearance of pai disty from rd 1600 to 42200 before kharif 2025.
Read moreAttending heavy leakages on 1200/800/7008600/450/400/300mm dia psc/ms/ci/di gravity mains from alwal to sainikpuri attending also minor leakages, chokages/repairs/overhauling of valves and jungle cutting etc., under annual maintenance for the period of two years under sainikpuri section, sd-iii, td-iv control room
Attending heavy leakages on 1200/800/700/600/450/300mm dia psc/ms/ci/di gravity mains from alwal to sainikpuri attending also minor leakages chokages/repairs/overhauling of valves and jungle cutting etc., under annual maintenance contract for the period of two years under sainikpuri section, sub division no. ii of transmission div.iv, control room
Read moreRemoval of accumulated silt from canal bed and jungle clerance from km 42.778 of d83 canal to km 9.500 of rsb of d83 canal
Removal of accumulated silt from canal bed and jungle clearance from km 42.778 of d-83 canal to km 9.500 of rsb of d-83 canal.
Read moreRemoval of silt and jungle clearance from 6l of rsb d 83 canal from km 7.065 to km 12.40 near kannala(v), nagaram(v) gunjapadugu(v) of manthini(m), peddapalli(d).
Removal of silt and jungle clearance from 6l of rsb-d83 canal from km 7.065 to km 12.40 near kannala (v), nagaram (v) and gunjapadugu (v) of manthani (m), peddapalli (d).
Read moreRemoval of accumulated earth and jungle clearance in rsd d83 canal bed from eklaspur (v) at km.35.559 to khanapur(v) at km.39.437 of manthani (m) (isd1,manthani)
Removal of accumulated earth and jungle clearance in rsb d83 canal bed from eklaspur (v) at km 35.559 to khanapur (v) at km 39.437 of manthani (m) (isd1, manthani).
Read moreProviding cc channeling from rd 5.744 km to rd 5.923 km, de-silting and raising of bank from rd 6.150 km to rd 7.100 km of mariwada minor
Providing cc channeling from rd 5.744 km to rd 5.923 km, de-silting and raising of bank from rd 6.150 km to rd 7.100 km of mariwada minor
Read moreThree phase cleaning of bushes and grass along with cutting and uprooting trees from rd 3500 ft. of 1st gap to rd 11650 ft. of 2nd gap of left dyke for the year 2025-26
Three phase cleaning of bushes and grass along with cutting and uprooting trees from rd 3500 ft. of 1st gap to rd 11650 ft. of 2nd gap of left dyke for the year 2025-26
Read moreof your Industry type