Tender Details
Particulars | Details |
---|---|
Title |
A/R M/O Narag Wasni Dinger Road Km 0/0 To 17/500 And A/R M/O Chourighat Sarsoo Road Km 0/0 To 4/0 (Sh P/L Patch Work In Km 0/00 To 1/0 And 10/00 To 14/00 , P/L Patch Work In Km 0/00 To 2/00)
|
Description |
A/R M/O Narag Wasni Dinger Road Km 0/0 To 17/500 And A/R M/O Chourighat Sarsoo Road Km 0/0 To 4/0 (Sh P/L Patch Work In Km 0/00 To 1/0 And 10/00 To 14/00 , P/L Patch Work In Km 0/00 To 2/00)
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_105038_2 |
Reference Number |
PW/SRN/CB/Tender/-409-459 dated 07-05-2025 |
Tender Fee | 1500 |
EMD | 53000 |
Tender Value | |
Place | Sarahan |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=153958 |
Start Date | May 08, 2025 22:25 |
End Date |
21/05/2025 ( Expired 11 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreAnnual surfacing on link road to village khatnol km. 0/00 to 10/000
Providing and laying 25 mm thick bituminous concrete along with providing and laying of hot applied thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00 ) add. kms. under amp 2025-26- village road
Read moreProtection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Protection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Read moreS and s of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 680 zero considered at lapcha on pt 4840 high ground bargiok lapcha rd under 108 rcc 759 brtf sector of project dpk in hp
S and s of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 680 zero considered at lapcha on pt 4840 high ground bargiok lapcha rd under 108 rcc 759 brtf sector of project dpk in hp
Read moreWidening 2 lane to 4 lane and strengthening of itaunja mahona kumhrawan kursi dewa chinhat road m d r 088c ch. 18.500 to 45.850 in district barabanki
Widening 2 lane to 4 lane and strengthening of itaunja mahona kumhrawan kursi dewa chinhat road m d r 088c ch. 18.500 to 45.850 in district barabanki
Read moreFdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Read moreWbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Read moreSsi, dgn and constr of two nos maj pmt bdg of span 50m over hmaranglui river at km 98.100 and 45 m over chotta golsuri river at km 140.875 on rd l-d-p incl both side approach road for all two brs under 71 rcc/24 tf under (p) psk in mizoram (2nd call)
Ssi, dgn and constr of two nos maj pmt bdg of span 50m over hmaranglui river at km 98.100 and 45 m over chotta golsuri river at km 140.875 on rd l-d-p incl both side approach road for all two brs under 71 rcc/24 tf under (p) psk in mizoram (2nd call)
Read moreWbpwd/pw(r)/sepd/piu-i/nit-10 of 2025-2026,sl-1
Widening and strengthening of bankura khatra road (sh-2) from 11.20 km to 45.00 kmp under bankura sub-division no.-ii under bankura division in the district of bankura.
Read moreof your Industry type