Tender Details
Particulars | Details |
---|---|
Title |
Erection Of Second Feeder Of 3.3 Kv From Vindhya Mines Substation To Kanchan Ocm To Deal With Pumping During Monsoon As Per Approved Project Report Aug 2014 Of Kanchan Ocm
|
Description |
Erection Of Second Feeder Of 3.3 Kv From Vindhya Mines Substation To Kanchan Ocm To Deal With Pumping During Monsoon As Per Approved Project Report Aug 2014 Of Kanchan Ocm
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_332826_1 |
Reference Number |
SECL/JHL/SO(EM)/24-25/ ET/242544 dt 18.03.2025 |
Tender Fee | 0 |
EMD | 37690 |
Tender Value | |
Place | SO EnM Office Johilla Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345008 |
Start Date | March 18, 2025 23:00 |
End Date |
28/03/2025 ( Expired 24 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Estimate for roof repairing of existing control room to pr leakage from rain water yard fencing with chain link mesh over rcc beam as per approved drawing at badodiya choki under gandhi sagar dc garoth division
Estimate for roof repairing of existing control room to pr leakage from rain water yard fencing with chain link mesh over rcc beam as per approved drawing at badodiya choki under gandhi sagar dc garoth division
Read moreTechnical estimate for providing power supply to 3 ph lt no. pww connection having requested load with erection of 25 kva 3 ph dt as per the request from the applicant in at 18 work tal. parola, dist. jalgaon
Technical estimate for providing power supply to 3 ph lt no. pww connection having requested load with erection of 25 kva 3 ph dt as per the request from the applicant in at 18 work tal. parola, dist. jalgaon
Read moreErection of 3.3 kv o/h line from kali mandir sub-station to pumping statio of hired patch-c and dismantling and erection of 11kv o/h line for clearing working area of proposed patch-c of abg colliery under govindpur area
Erection of 3.3 kv o/h line from kali mandir sub-station to pumping statio of hired patch-c and dismantling and erection of 11kv o/h line for clearing working area of proposed patch-c of abg colliery under govindpur area
Read moreRe-organization of 3.3 kv pump and shovel line and extension of these overhead head line as per requirement during monsoon in respect to bokaro colliery
Re-organization of 3.3 kv pump and shovel line and extension of these overhead head line as per requirement during monsoon in respect to bokaro colliery
Read moreConstruction of 33 kv underground power line with xlpe cable from 132/33 kv sub-station to 33/0.433 kv sub-station as per apdcl authority s requirement and other allied works at the external service block of the 500 bedded mother and child hospital
Construction of 33 kv underground power line with xlpe cable from 132/33 kv sub-station to 33/0.433 kv sub-station as per apdcl authority s requirement and other allied works at the external service block of the 500 bedded mother and child hospital
Read morePartial tree trimming and uprooting creeper near above of 11 kv oh line from parej substation to tapin north substation, 3.3 kv oh line of feeder 1, feeder 2, colony feeder and 440v,220v oh line of workshop, colonies in pre and post monsoon at tapin
Partial tree trimming and uprooting creeper near above of 11 kv oh line from parej substation to tapin north substation, 3.3 kv oh line of feeder 1, feeder 2, colony feeder and 440v,220v oh line of workshop, colonies in pre and post monsoon at tapin
Read morePicking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026
Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026
Read moreErection of 7 span of ht oh line (3.3 kv) as extension of feeder no.-5 for provision of power to face pump at departmental patch (2) erection of 4 span ht oh line(3.3 kv) as extension of feeder no-1 for provision of power to excavators in department
Erection of 7 span of ht oh line (3.3 kv) as extension of feeder no.-5 for provision of power to face pump at departmental patch (2) erection of 4 span ht oh line(3.3 kv) as extension of feeder no-1 for provision of power to excavators in department
Read moreErection of second feeder of 3.3 kv from vindhya mines substation to kanchan ocm to deal with pumping during monsoon as per approved project report aug 2014 of kanchan ocm
Erection of second feeder of 3.3 kv from vindhya mines substation to kanchan ocm to deal with pumping during monsoon as per approved project report aug 2014 of kanchan ocm
Read more(1)diversion of 3.3 kv power feeder for ocp deparmental pumping station at akwmc.(2) installation of 04 nos.lighting arrestor with 04 nos.chemical earth pit for safety from thundering lighting
(1)diversion of 3.3 kv power feeder for ocp deparmental pumping station at akwmc.(2) installation of 04 nos.lighting arrestor with 04 nos.chemical earth pit for safety from thundering lighting
Read moreof your Industry type