Tender Details

Particulars Details
Title
Erection Of Second Feeder Of 3.3 Kv From Vindhya Mines Substation To Kanchan Ocm To Deal With Pumping During Monsoon As Per Approved Project Report Aug 2014 Of Kanchan Ocm
Description
Erection Of Second Feeder Of 3.3 Kv From Vindhya Mines Substation To Kanchan Ocm To Deal With Pumping During Monsoon As Per Approved Project Report Aug 2014 Of Kanchan Ocm
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_SECL_332826_1
Reference
Number
SECL/JHL/SO(EM)/24-25/ ET/242544 dt 18.03.2025
Tender Fee 0
EMD 37690
Tender Value
Place SO EnM Office Johilla Area
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345008
Start Date March 18, 2025 23:00
End Date

28/03/2025 ( Expired 24 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Estimate for roof repairing of existing control room to pr leakage from rain water yard fencing with chain link mesh over rcc beam as per approved drawing at badodiya choki under gandhi sagar dc garoth division

Estimate for roof repairing of existing control room to pr leakage from rain water yard fencing with chain link mesh over rcc beam as per approved drawing at badodiya choki under gandhi sagar dc garoth division

Read more
Technical estimate for providing power supply to 3 ph lt no. pww connection having requested load with erection of 25 kva 3 ph dt as per the request from the applicant in at 18 work tal. parola, dist. jalgaon

Technical estimate for providing power supply to 3 ph lt no. pww connection having requested load with erection of 25 kva 3 ph dt as per the request from the applicant in at 18 work tal. parola, dist. jalgaon

Read more
Erection of 3.3 kv o/h line from kali mandir sub-station to pumping statio of hired patch-c and dismantling and erection of 11kv o/h line for clearing working area of proposed patch-c of abg colliery under govindpur area

Erection of 3.3 kv o/h line from kali mandir sub-station to pumping statio of hired patch-c and dismantling and erection of 11kv o/h line for clearing working area of proposed patch-c of abg colliery under govindpur area

Read more
Re-organization of 3.3 kv pump and shovel line and extension of these overhead head line as per requirement during monsoon in respect to bokaro colliery

Re-organization of 3.3 kv pump and shovel line and extension of these overhead head line as per requirement during monsoon in respect to bokaro colliery

Read more
Construction of 33 kv underground power line with xlpe cable from 132/33 kv sub-station to 33/0.433 kv sub-station as per apdcl authority s requirement and other allied works at the external service block of the 500 bedded mother and child hospital

Construction of 33 kv underground power line with xlpe cable from 132/33 kv sub-station to 33/0.433 kv sub-station as per apdcl authority s requirement and other allied works at the external service block of the 500 bedded mother and child hospital

Read more
Partial tree trimming and uprooting creeper near above of 11 kv oh line from parej substation to tapin north substation, 3.3 kv oh line of feeder 1, feeder 2, colony feeder and 440v,220v oh line of workshop, colonies in pre and post monsoon at tapin

Partial tree trimming and uprooting creeper near above of 11 kv oh line from parej substation to tapin north substation, 3.3 kv oh line of feeder 1, feeder 2, colony feeder and 440v,220v oh line of workshop, colonies in pre and post monsoon at tapin

Read more
Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026

Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026

Read more
Erection of 7 span of ht oh line (3.3 kv) as extension of feeder no.-5 for provision of power to face pump at departmental patch (2) erection of 4 span ht oh line(3.3 kv) as extension of feeder no-1 for provision of power to excavators in department

Erection of 7 span of ht oh line (3.3 kv) as extension of feeder no.-5 for provision of power to face pump at departmental patch (2) erection of 4 span ht oh line(3.3 kv) as extension of feeder no-1 for provision of power to excavators in department

Read more
Erection of second feeder of 3.3 kv from vindhya mines substation to kanchan ocm to deal with pumping during monsoon as per approved project report aug 2014 of kanchan ocm

Erection of second feeder of 3.3 kv from vindhya mines substation to kanchan ocm to deal with pumping during monsoon as per approved project report aug 2014 of kanchan ocm

Read more
(1)diversion of 3.3 kv power feeder for ocp deparmental pumping station at akwmc.(2) installation of 04 nos.lighting arrestor with 04 nos.chemical earth pit for safety from thundering lighting

(1)diversion of 3.3 kv power feeder for ocp deparmental pumping station at akwmc.(2) installation of 04 nos.lighting arrestor with 04 nos.chemical earth pit for safety from thundering lighting