Tender Details
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Bm Unit Iii Replacement Of Wornout Corroded Structural Supports Painting Of Structurals Removal Of Existing Wornout Asbestos Sheets And Providing New Galvalume Sheets In All Four Sides In Unit Iii Boiler At 56mtr Elevation
|
Description |
Ttps Mech Ii Bm Unit Iii Replacement Of Wornout Corroded Structural Supports Painting Of Structurals Removal Of Existing Wornout Asbestos Sheets And Providing New Galvalume Sheets In All Four Sides In Unit Iii Boiler At 56mtr Elevation
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 6700 |
Tender Value | |
Place | TTPS |
Link |
AAAAAAAAAA Login to view |
Start Date | May 30, 2025 19:30 |
End Date |
16/06/2025 ( 14 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Emcp/1004628651/replacement of existing old ac sheet with galvalume sheets, painting roof leakage works in diesel power house
Emcp/1004628651/replacement of existing old ac sheet with galvalume sheets,
 painting roof leakage works in diesel power house
Read moreTtps mech ii bm unit iii strengthening of weak welding joints of step grills platform grills and renewal of damaged corroded structurals from 0 mtr to 52 mtr elevation of unit iii boiler
Ttps mech ii bm unit iii strengthening of weak welding joints of step grills platform grills and renewal of damaged corroded structurals from 0 mtr to 52 mtr elevation of unit iii boiler
Read moreTtps mech ii bm unit iii replacement of wornout corroded structural supports painting of structurals removal of existing wornout asbestos sheets and providing new galvalume sheets in all four sides in unit iii boiler at 56mtr elevation
Ttps mech ii bm unit iii replacement of wornout corroded structural supports painting of structurals removal of existing wornout asbestos sheets and providing new galvalume sheets in all four sides in unit iii boiler at 56mtr elevation
Read moreRenewal/ replacement of asbestos cement roof with galvalume sheets in new melting work shop(nms) inside factory at of katni.
Renewal/ replacement of asbestos cement roof with galvalume sheets in new melting work shop(nms) inside factory at of katni.
Read moreDr.nttps-replacement of damaged gci sheets with pre painted trapezoidal profile galvalume roofing sheets for the roof and side cladding of boiler lift shafts of unit -iii.
Dr.nttps-replacement of damaged gci sheets with pre painted trapezoidal profile galvalume roofing sheets for the roof and side cladding of boiler lift shafts of unit -iii.
Read moreTtps mech ii bm unit iv v boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
Ttps mech ii bm unit iv v boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
Read moreTtps mech ii bm unit i ii iii boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of
Ttps mech ii bm unit i ii iii boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of
Read moreSupply of galvalume sheets of thickness not less than 0.8mm conforming to is14246 for coverage in 32 mtr elevation above hot air duct and 52mtr elevation above walk way in unit i ii and iii boiler
Supply of galvalume sheets of thickness not less than 0.8mm conforming to is14246 for coverage in 32 mtr elevation above hot air duct and 52mtr elevation above walk way in unit i ii and iii boiler
Read moreTtps mech ii bm unit iv replacement of boiler roof sheet including replacement of worn out corroded structural supports painting of structurals removal of existing wornout gi frp asbestos sheets and fixing of new galvalume sheets in boiler
Ttps mech ii bm unit iv replacement of boiler roof sheet including replacement of worn out corroded structural supports painting of structurals removal of existing wornout gi frp asbestos sheets and fixing of new galvalume sheets in boiler
Read moreTtps mech ii ahp attending maintenance works in ash slurry sump strainers at ash slurry pump house removal of clinkers and debris to avoid choking in ash slurry pump and ash disposal pipelines of unit i ii iii for the period from 01 04 2025 to 31
Ttps mech ii ahp attending maintenance works in ash slurry sump strainers at ash slurry pump house removal of clinkers and debris to avoid choking in ash slurry pump and ash disposal pipelines of unit i ii iii for the period from 01 04 2025 to 31
Read moreof your Industry type