Tender Details
Particulars | Details |
---|---|
Title |
Work Contract For Attending Oil Leakage From L.V. Bushing Of 25 Mva, 11 132 Kv, 01 No. Generator Transformer Including Supply Of Material At 3x20 Mw, Bhps 3, Mppgcl, Deolond
|
Description |
Work Contract For Attending Oil Leakage From L.V. Bushing Of 25 Mva, 11 132 Kv, 01 No. Generator Transformer Including Supply Of Material At 3x20 Mw, Bhps 3, Mppgcl, Deolond
|
Organisation | Madhya Pradesh Power Generating Company Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 795 |
EMD | 10000 |
Tender Value | |
Place | BHPS 3 Deolond |
Link |
AAAAAAAAAA Login to view |
Start Date | April 03, 2025 00:20 |
End Date |
23/04/2025 ( 3 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of 4500 lph high vacuum transformer oil filteration machine for 3x20 mw, bs iii, mppgcl, deolond
Procurement of 4500 lph high vacuum transformer oil filteration machine for 3x20 mw, bs iii, mppgcl, deolond
Read moreThe work for attending oil leakage from various points of 2 nos. 10 mva power t/f installed at 33/11 kv s/s townhall, varanasi under ee, uedd-iii, varanasi in o and m scheme 2025-26
The work for attending oil leakage from various points of 2 nos. 10 mva power t/f installed at 33/11 kv s/s townhall, varanasi under ee, uedd-iii, varanasi in o and m scheme 2025-26
Read moreWork contract for attending oil leakage from l.v. bushing of 25 mva, 11 132 kv, 01 no. generator transformer including supply of material at 3x20 mw, bhps 3, mppgcl, deolond
Work contract for attending oil leakage from l.v. bushing of 25 mva, 11 132 kv, 01 no. generator transformer including supply of material at 3x20 mw, bhps 3, mppgcl, deolond
Read moreAttending of transformer oil leakage and painting work in 63 mva transformer at 132 kv sub station azadnagar under etd-i kanpur
Attending of transformer oil leakage and painting work in 63 mva transformer at 132 kv sub station azadnagar under etd-i kanpur
Read moreSupply and fixing of ngr 3.3kv 10 amp, 190 ohms for 3 nos., 1 mva, 11kv/3.3kv (2 nos.) and 1.6 mva, 11kv/3.3 kv (01 no.) power transformer installed at main and banwar substation at topa project under kuju area.
Supply and fixing of ngr 3.3kv 10 amp, 190 ohms for 3 nos., 1 mva, 11kv/3.3kv (2 nos.) and 1.6 mva, 11kv/3.3 kv (01 no.) power transformer installed at main and banwar substation at topa project under kuju area.
Read moreDesign, supply, erection, testing, commissioning of 25 mva power transformer at tembhu lis stage 3, mahuli. 4 mva transformer and 33 kv bay at stage 4 vejegaon, tal.khanapur, dist.sangli
Design, supply, erection, testing, commissioning of 25 mva power transformer at tembhu lis stage 3, mahuli. 4 mva transformer and 33 kv bay at stage 4 vejegaon, tal.khanapur, dist.sangli
Read moreThe work for annual repair, maintenance and attending oil leakage from various points of 10 mva power t/f installed at 33/11 kv s/s ledhupur and 5 mva power t/f installed at new daulatpur, varanasi under ee, uedd-vi, varanasi
The work for annual repair, maintenance and attending oil leakage from various points of 10 mva power t/f installed at 33/11 kv s/s ledhupur and 5 mva power t/f installed at new daulatpur, varanasi under ee, uedd-vi, varanasi
Read moreAugmentation work of 01 nos 132/33 kv 40/50 mva power transformer(spare from 132kv gss sirsi) in place of 20/25 mva transformer at 132 kv gss bhankrota
Augmentation work of 01 nos 132/33 kv 40/50 mva power transformer(spare from 132kv gss sirsi) in place of 20/25 mva transformer at 132 kv gss bhankrota
Read moreComplete oil centrifuging and attend the leakage of lv bushing 63 mva transformer-ii at 132 kv teliarganj prayagraj
Complete oil centrifuging and attend the leakage of lv bushing 63 mva transformer-ii at 132 kv teliarganj prayagraj
Read moreInstallation erection filtration painting commissioning and testing of 5 mva 66 11 kv transformer along with hot oil filtration of 3 mva 3.2 mva 66 11 kv transformers installed at stage ii switchyard including supply of materials other allied works
Installation erection filtration painting commissioning and testing of 5 mva 66 11 kv transformer along with hot oil filtration of 3 mva 3.2 mva 66 11 kv transformers installed at stage ii switchyard including supply of materials other allied works
Read moreof your Industry type