Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Nitrile Rubber O Rings 🛠️ The Ministry Of Railways, Specifically The Central Government Ministry/Department, Is Seeking Bids For The Supply Of Nitrile Rubber O Rings With Precise Dimensions. 🔧 📅 Bid Submission Deadline: June 18, 2024, 11:30 Am Interested Bidders Are Advised To Refer To The Tender Document For Complete Details Regarding Specifications, Quality Standards, And Submission Procedures. Keywords: Nitrile Rubber O Rings, Ministry Of Railways, Central Govt. Ministry/Department, Tender, Procurement, Mumbai Cst| Particulars | Details |
|---|---|
| Title |
Top Lifting Hook For Modified Cbc Opera
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106346189 |
|
Reference Number |
69245170 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Jabalpur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/112024/106506887/viewNitPdf_4752648.pdf |
| Start Date | October 23, 2024 22:01 |
| End Date |
Expired
04/11/2024
Expired 706 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Roof top rain water harvesting work for type-3 houses in chitrakoot district
Roof top rain water harvesting work for type-3 houses in chitrakoot district
Read moreHiring of hitachi for lifting of garbage and providing access to sanitation vehicles at dumping yard in shankarpally municipality. under municipal general fund. recall.
Hiring of hitachi for lifting of garbage and providing access to sanitation vehicles at dumping yard in shankarpally municipality. under municipal general fund. recall.
Read moreEmergency branch prunning and green wastage lifting for 156 days (6 months) in circle-11, nagole, lb.nagar zone, mmc for the year 2026-27
Emergency branch prunning and green wastage lifting for 156 days (6 months) in circle-11, nagole, lb.nagar zone, mmc for the year 2026-27
Read moreLifting of deris at balkapu nala at a) bridge no.17 to 18 b) bridge no.18 to 19 under syed nagar -139 cir no.33, gz ghmc (item no.5)
Lifting of deris at balkapu nala at a) bridge no.17 to 18 b) bridge no.18 to 19 under syed nagar -139 cir no.33, gz ghmc (item no.5)
Read moreRepairs and preventive maintenance of 11 nos rfcs for lifting of garbage in various circles of khairtabad zone, ghmc through annual maintenance contract for a period of 1 year that is from 15-10-2026 to 14-10-2027.
Repairs and preventive maintenance of 11 nos rfcs for lifting of garbage in various circles of khairtabad zone, ghmc through annual maintenance contract for a period of 1 year that is from 15-10-2026 to 14-10-2027.
Read moreOn-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreOn-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreCarrying out repairs for strengthening, sandblasting and painting with anti-corrosive coating for intake service gates of unit # 5 (two gates) and painting of stop log gates (22 elements) and lifting beam of mono rail hoist available at intake gates of pjhes with anti-corrosive paint
Carrying out repairs for strengthening, sandblasting and painting with anti-corrosive coating for intake service gates of unit # 5 (two gates) and painting of stop log gates (22 elements) and lifting beam of mono rail hoist available at intake gates of pjhes with anti-corrosive paint
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreof your Industry type