Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Removal Of Accumulated Material From Desilting Basin Downstream Of Sumbal Headwork Of Ushp Ii
|
Description |
Removal Of Accumulated Material From Desilting Basin Downstream Of Sumbal Headwork Of Ushp Ii
|
Organisation | JKSPDC | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1000 |
EMD | 40800 |
Tender Value | |
Place | sumbal |
Link |
AAAAAAAAAA Login to view |
Start Date | June 12, 2025 19:30 |
End Date |
01/07/2025 ( 16 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Supply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Read moreConstr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreCs for dpr for (i) development of gf northern hamirpur bypass of 2l/ps kohli to chilbahal in shimla mataur sec of nh103 (ii) upgrade/develop/widening of 2l/ps to 4l/ps from end of hamirpur bypass chilbahal to bhangbar sec new nh03 n nh303 in hp pkg4
Cs for dpr for (i) development of gf northern hamirpur bypass of 2l/ps kohli to chilbahal in shimla mataur sec of nh103 (ii) upgrade/develop/widening of 2l/ps to 4l/ps from end of hamirpur bypass chilbahal to bhangbar sec new nh03 n nh303 in hp pkg4
Read moreInsulation, refractory and removal of fly ash, debris from pressure part, ducts, hoppers and roof of pent house etc. during overhauling of unit-03, 3x210 m.w., atps, anpara
Insulation, refractory and removal of fly ash, debris from &#x0d pressure part, ducts, hoppers and roof of pent house etc. during &#x0d overhauling of unit-03, 3x210 m.w., atps, anpara
Read moreRemoval and replacement of damaged precast slab of cable trench and drain from different places of 220 kv and 132 kv switch yard, ctps.
Removal and replacement of damaged precast slab of cable trench and drain from different places of 220 kv and 132 kv switch yard, ctps.
Read moreIe services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreSpl repair to roads at various location under age b/r-ii, hill road hq bldg and approach road of div hq camp area, hawk drive road from gym to div hq 36 rapid(s), mango grove area and jcos/or md accn d area at vk line under ge saugor
Spl repair to roads at various location under age b/r-ii, hill road hq bldg and approach road of div hq camp area, hawk drive road from gym to div hq 36 rapid(s), mango grove area and jcos/or md accn d area at vk line under ge saugor
Read moreAnnual work of cleaning of drain, cleaning and sweeping and road, paved area, open area and removal of gajar grass and disposal of dead animals from power house premises at atps, chachai.
Annual work of cleaning of drain, cleaning and sweeping and road, paved area, open area and removal of gajar grass and disposal of dead animals from power house premises at atps, chachai.
Read moreof your Industry type