Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Electro Pneumatic Pressurized Flushing System 🛁 The Ministry Of Railways, Under The Central Government, Invites Bids For The Supply Of An Electro Pneumatic Pressurized Flushing System For Lhb Coaches. 🛤️ 📅 Bid Submission Deadline: April 4, 2024, 2:15 Pm Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 474,080. No Tender Fee Is Payable. Bidders Are Advised To Refer To The Tender Document For Complete Details And Specifications. Keywords: Electro Pneumatic Pressurized Flushing System, Lhb Coaches, Ministry Of Railways, Central Government Ministry/Department, Tender, Bid Opportunity| Particulars | Details |
|---|---|
| Title |
S&I Of Electro Pneumatic Pressurized Flushing System For Lhb Coaches
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106305259 |
|
Reference Number |
07240126 |
| Tender Fee | 0 |
| EMD | 4.74 Lakh |
| Tender Value | - |
| Place | Chennai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/042024/106305259/viewNitPdf_4524258.pdf |
| Start Date | March 28, 2024 21:34 |
| End Date |
Expired
04/04/2024
Expired 880 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hinged cover for blind socket assembly of inter vehicular coupler 500 amps for lhb coaches
Hinged cover for blind socket assembly of inter vehicular coupler 500 amps for lhb coaches
Read moreRepair/replacement of u/s lt ug cable and connected works for area-i and ii at mil stn talbehat
Repair/replacement of u/s lt ug cable and connected works for area-i and ii at mil stn talbehat
Read moreResurvey of sampaje rf extn block-i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 7.10 km in sullia range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Resurvey of sampaje rf extn block-i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 7.10 km in sullia range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Read moreResurvey of yadehalli block-i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 15.00 km in anandapura range, sagara division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Resurvey of yadehalli block-i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 15.00 km in anandapura range, sagara division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Read moreResurvey of hirebandady bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 25.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Resurvey of hirebandady bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 25.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Read moreResurvey of kodiyadibeliyuru block bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 09.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Resurvey of kodiyadibeliyuru block bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 09.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Read moreResurvey of uruval block-i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 28.10 km in uppinangadi range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Resurvey of uruval block-i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 28.10 km in uppinangadi range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Read moreResurvey of ujire rf block-i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 7.50 km in belthangady range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Resurvey of ujire rf block-i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 7.50 km in belthangady range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Read moreResurvey of kalmadka extn block i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 7.50 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Resurvey of kalmadka extn block i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 7.50 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Read moreResurvey of balpa rf block bit i, ii & iii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 6.75 km in panja range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Resurvey of balpa rf block bit i, ii & iii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 6.75 km in panja range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Read moreof your Industry type