Tender Details

Particulars Details
Title
Execution Of Earthwork In Formation, Construction Of Minor Bridges, Blanketing, P. Way Linking Works Including Supply Of P. Way Fittings, Track Ballast, Psc Sleeper And Points And Crossings, Construction Of Ei Building In Connection With Construction
Description
Execution Of Earthwork In Formation, Construction Of Minor Bridges, Blanketing, P. Way Linking Works Including Supply Of P. Way Fittings, Track Ballast, Psc Sleeper And Points And Crossings, Construction Of Ei Building In Connection With Construction
Organisation RITES Ltd. | Public Sector Undertakings
Tender Id 2025_RITES_231002_1
Reference
Number
16 / OT / 24-25 / RITES / PU-BSP / SECL-Baihatola Siding/ PKG-IIC, Date 24.03.2025
Tender Fee 15000
EMD 36.39 Lakh
Tender Value -
Place Baihatola Railway Station,Anuppur, MP
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=260547

Start Date March 28, 2025 15:30
End Date
Expired 21/04/2025

Expired 542 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
P.way ( track) linking work on railway formation along with linking to existing line at tangarbansali yard including supply of ballast at tangarbansali of ranchi divsion.

P.way ( track) linking work on railway formation along with linking to existing line at tangarbansali yard including supply of ballast at tangarbansali of ranchi divsion.

Read more
Shoranur-mangaluru section: (1) proposed re-construction of br. no. 904 (proposed dn line) at km 636/100-300 as 5 x 18.0m effective span psc i girder & slab and 1 x 6.1m clear span psc slab between tanur & parappanangadi stations (2) proposed reconstruction of br. no. 1085 (proposed up line) at km 735/000-200 as 3 x 18m effective span psc i girder & slab between thalassery & etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast

Shoranur-mangaluru section: (1) proposed re-construction of br. no. 904 (proposed dn line) at km 636/100-300 as 5 x 18.0m effective span psc i girder & slab and 1 x 6.1m clear span psc slab between tanur & parappanangadi stations (2) proposed reconstruction of br. no. 1085 (proposed up line) at km 735/000-200 as 3 x 18m effective span psc i girder & slab between thalassery & etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast

Read more
Balance work of earthwork in formation, blanketing and construction of minor bridge no. 15,25,35 and 37 between the section of bhagauli(excluding) to bakhira (including) in connection with khalilabad- bahraich new b.g rail line project.

Balance work of earthwork in formation, blanketing and construction of minor bridge no. 15,25,35 and 37 between the section of bhagauli(excluding) to bakhira (including) in connection with khalilabad- bahraich new b.g rail line project.

Read more
Execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.

Execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.

Read more
Balance work of execution of earthwork in formation, blanketing and construction of minor bridge no. 40, 44, 46, 53 & 60 between the section of mehdawal (excluding) to kheshraha (excluding) in connection with khalilabad- bahraich new b.g rail line project.

Balance work of execution of earthwork in formation, blanketing and construction of minor bridge no. 40, 44, 46, 53 & 60 between the section of mehdawal (excluding) to kheshraha (excluding) in connection with khalilabad- bahraich new b.g rail line project.

Read more
Construction of new railway line between deshalpar - hajipir - luna (82.38kms) (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works i

Construction of new railway line between deshalpar - hajipir - luna (82.38kms) (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works i

Read more
Construction of 2nd new railway line (doubling works) between section kanalus(including) - okha (including) from km:853.36 to km:994.35 (including all yards and stations falling in the section) covering all works that are earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs, all p. way works (including laying and linking), supply of all types of sleepers, all p. way fittings, other civil engineering works, signal & telecommunica

Construction of 2nd new railway line (doubling works) between section kanalus(including) - okha (including) from km:853.36 to km:994.35 (including all yards and stations falling in the section) covering all works that are earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs, all p. way works (including laying and linking), supply of all types of sleepers, all p. way fittings, other civil engineering works, signal & telecommunica

Read more
Construction of new railway line between vayor - lakhpat (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works in ahmedabad division

Construction of new railway line between vayor - lakhpat (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works in ahmedabad division

Read more
Strengthening of substructure and replacement of existing fish bellied plate girders upto 12.20m span of major bridges br. no 736up (4x12.2m) at km:554/0-2,balance work of br no.750up (10x12.2m) at km:564/8-9, br no.792up (9x12.2m) at km:597/0-1, br no.823up (2x12.2m) at km:621/9-622/0, br.no.848up (2x12.2m) atkm:639/5-6 by post tensioned psc slabs, lifting/linking of track, supply of ballast, earthwork, blanketing work and other ancillary work as per 25t loading standard in the jurisdiction o

Strengthening of substructure and replacement of existing fish bellied plate girders upto 12.20m span of major bridges br. no 736up (4x12.2m) at km:554/0-2,balance work of br no.750up (10x12.2m) at km:564/8-9, br no.792up (9x12.2m) at km:597/0-1, br no.823up (2x12.2m) at km:621/9-622/0, br.no.848up (2x12.2m) atkm:639/5-6 by post tensioned psc slabs, lifting/linking of track, supply of ballast, earthwork, blanketing work and other ancillary work as per 25t loading standard in the jurisdiction o

Read more
Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi

Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi