Tender Details

Particulars Details
Title
Supply Of Free End Side Plate And Supporting Channels For Unit V Bottom Ash Hopper In Scf 5 A2
Description
Supply Of Free End Side Plate And Supporting Channels For Unit V Bottom Ash Hopper In Scf 5 A2
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_455389_1
Reference
Number
CE/TTPS/3497-S
Tender Fee 0
EMD 8400
Tender Value -
Place CE/TTPS
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=541649

Start Date June 18, 2024 22:30
End Date
Expired 04/07/2024

Expired 832 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Ttps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul

Ttps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul

Read more
Ktps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg

Ktps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg

Read more
Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.

Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.

Read more
Rectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1

Rectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1

Read more
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - overhauling work of bottom ash hopper system and dfa system of unit no 10 btps obra power house equipment service provider

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - overhauling work of bottom ash hopper system and dfa system of unit no 10 btps obra power house equipment service provider

Read more
Ttps mech ii ahp unit v bah scrapper conveyor feeder 5a2 erection of new free end side plate and its supporting channels after removing of wornout free end side plate channels and normalising the feeder

Ttps mech ii ahp unit v bah scrapper conveyor feeder 5a2 erection of new free end side plate and its supporting channels after removing of wornout free end side plate channels and normalising the feeder

Read more
Ttps mech ii ahp unit v bah scrapper conveyor feeder 5a1 erection of new free end side plate slope plate bottom plate and its supporting channels after removing of wornout free end side plate slope bottom plates channels and normalising the fe

Ttps mech ii ahp unit v bah scrapper conveyor feeder 5a1 erection of new free end side plate slope plate bottom plate and its supporting channels after removing of wornout free end side plate slope bottom plates channels and normalising the fe

Read more
Ttps mech ii ahp unit iv bah scrapper conveyor feeder 4a2 erection of new free end side plate slope plate bottom plate and its supporting channels after removing of wornout free end side plate slope bottom plates channels and normalising the feeder

Ttps mech ii ahp unit iv bah scrapper conveyor feeder 4a2 erection of new free end side plate slope plate bottom plate and its supporting channels after removing of wornout free end side plate slope bottom plates channels and normalising the feeder

Read more
Supply of scf 4a2 body plate with supporting channels for unit iv scrapper conveyor feeders

Supply of scf 4a2 body plate with supporting channels for unit iv scrapper conveyor feeders

Read more
Bottom ash hopper mother plate reclamation and strengthening works

Bottom ash hopper mother plate reclamation and strengthening worksduring unit4 overhaul of rstps 2023-24

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise