| Particulars | Details |
|---|---|
| Title |
General Pvip Clearing Blockages Clearing Blockage In Cross Regulators ,Syphons, Culverts,Cut And Cover Etc.In Hlc From Ch 17/716 Km To 24/312 Km, Kolenchery Branch Canal Upto Ch 4/600 Km And Mazhuvannoor Branch Canal And In All Distributaries, Shutte
|
| Description |
The Items Included In This Estimate Are Earth Work Excavation For Removing Silt Deposited By Flowing Water, Labour For Removing Blockage And For Water Distribution, Labour For Cleaning Of Well And Pump House,Bailing Out Water ,Steel Work,Removing Wat
|
| Organisation | Irrigation Department | State Govt. and UT |
| Tender Id | 2024_Irrig_700099_1 |
|
Reference Number |
IRR/PII/TR/2526/2024_5_1_1/1 |
| Tender Fee | 655 |
| EMD | 7413 |
| Tender Value | - |
| Place | Kolenchery |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1093439 |
| Start Date | October 26, 2024 22:30 |
| End Date |
Expired
04/11/2024
Expired 710 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual maintenance of clearing and removing siltfrom the mundopilly branch canal from ch 0650 to 1200 km and vengoor branch canal fromch5050 to 6100 km and clearing removing floating materials during water distribution inkalady main canal from ch 000
Annualmaintenance and water distribution
Read moreGeneral-pvip-action plan 2026-27 annual maintenance of high level canal from ch 11/796 km to 17/716 km -general civil work
General-pvip-action plan 2026-27 annual maintenance of high level canal from ch 11/796 km to 17/716 km -general civil work
Read moreGeneral action plan 2026 27 clearing jungle of kip lb main canal from ch.41762m to 56016m prior to water distribution under the jurisdiction of kip lb section no.19/13 kollam. general civil work
General action plan 2026 27 clearing jungle of kip lb main canal from ch.41762m to 56016m prior to water distribution under the jurisdiction of kip lb section no.19/13 kollam. general civil work
Read moreGeneral action plan 2026 2027 kip o m annual maintenance work under the section 13 4 charumoodu clearing jungle silt and floating body removal for nediyapadam north canal from ch 0 to 7340m general civil work
General action plan 2026 2027 kip o m annual maintenance work under the section 13 4 charumoodu clearing jungle silt and floating body removal for nediyapadam north canal from ch 0 to 7340m general civil work
Read moreGeneral action plan 2026 2027 kip o m annual maintenance work under the section 13 4 charumoodu clearing jungle silt and floating body removal for nediyapadam south canal at ch 0 to 9400 m general civil work
General action plan 2026 2027 kip o m annual maintenance work under the section 13 4 charumoodu clearing jungle silt and floating body removal for nediyapadam south canal at ch 0 to 9400 m general civil work
Read moreGeneral-action plan 2023-24-pvip-clearing blockage in cross regulators ,syphons, culverts,cut and cover etc.in hlc from ch 17.716 km to 24.312 km, perumani md, perumani fc, kolenchery branch canal, karukappilly md, kadamattom md and mazhuvannoor bran
Earthwork, labour for removing blockage, rcc, steel work of gate
Read moreGeneral-pvip-clearing blockages-clearing blockage in cross regulators ,syphons, culverts, cut and cover etc.in hlc
The items included in this estimate are earth&#x0d work excavation for removing silt deposited by&#x0d flowing water, labour for removing blockage&#x0d and for water distribution, lumpsum concrete&#x0d for hole filling etc
Read moreGeneral-pvip-mazhuvannoor branch canal-annual maintenance of mazhuvannoor branch canal from ch0/000km to ch
Refer nit
Read moreGeneral-pvip-mazhuvannoor branch canal-annual maintenance of mazhuvannoor branch canal from ch6/010km to ch11/526km for the year 2026-27 including clearing blockages in cross regulators ,syphons, culvert, cut and cover, operating all shutters in
Refer nit
Read moreGeneral-pvip-kolenchery branch canal-annual maintenance of kolenchery branch canal from ch 2.510 km to ch 4.600km for the year 2024-25-general civil work
Clearing grass,clearing jungle,earth work excavation, etc
Read moreof your Industry type