Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Replacement Of Primary Reformer Burner Blocks With Surrounding Refractory Material In Ammonia Ii Plant
|
| Description |
Replacement Of Primary Reformer Burner Blocks With Surrounding Refractory Material In Ammonia Ii Plant
|
| Organisation | Department of Fertilisers | Central Govt. Ministry/Department |
| Tender Id | 2025_MCF_793714_1 |
|
Reference Number |
NFVP/M/Amm-II/Cont-128/2024-25 |
| Tender Fee | 0 |
| EMD | 1 Lakh |
| Tender Value | - |
| Place | NFL VIJAIPUR |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1098212 |
| Start Date | March 29, 2025 15:30 |
| End Date |
Expired
04/04/2025
Expired 559 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
An 91174 gas gun assembly in primary reformer
An 91174 gas gun assembly in primary reformer
Read moreInspection and supervision works against damaged refractory linings and refractory materials inside reformer of 500 tpd methanol plant in apl
Inspection and supervision works against damaged refractory linings and refractory materials inside reformer of 500 tpd methanol plant in apl
Read moreFused cast of refractory blocks (azs) as per attached technical specification
Fused cast of refractory blocks (azs) as per attached technical specification
Read moreReplacement of 48 nos. m.s. windows with new aluminium windows at toilet/bathroom blocks of hall-11
Replacement of 48 nos. m.s. windows with new aluminium windows at toilet/bathroom blocks of hall-11
Read moreAddn/altn to toilet blocks (04 nos) of primary wing of pm shri kendriya vidyalay amc cc under ge (east) lucknow
Addn/altn to toilet blocks (04 nos) of primary wing of pm shri kendriya vidyalay amc cc under ge (east) lucknow
Read moreBmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Read morePrimary total hip replacement prosthesis set ( containing : uncemented femoral stem, modular shell, modular liner, femoral ceramic head, hip bone screw)
Primary total hip replacement prosthesis set ( containing : uncemented femoral stem, modular shell, modular liner, femoral ceramic head, hip bone screw)
Read moreRepair and replacement to flooring ceiling aluminium windows and partition works of all blocks at mbc (restricted area) under ge (south west) new delhi-03
Repair and replacement to flooring ceiling aluminium windows and partition works of all blocks at mbc (restricted area) under ge (south west) new delhi-03
Read moreRe-carpeting of roads with bc, replacement of tiles over sidewalks in blocks- d,e,f and residency green of greenwood city in ward-12 under mcg
Re-carpeting of roads with bc, replacement of tiles over sidewalks in blocks- d,e,f and residency green of greenwood city in ward-12 under mcg
Read moreCustom bid for services - replacement of drive units and door sensor assemblies in otis elevators at blocks 22-26 and 31-36 (22 lifts), bpcl staff colony, chembur, mumbai
Custom bid for services - replacement of drive units and door sensor assemblies in otis elevators at blocks 22-26 and 31-36 (22 lifts), bpcl staff colony, chembur, mumbai
Read moreof your Industry type