Tender Details

Particulars Details
Title
08/Nit/Bsnl/Cd/Hbl/2023 24
Description
Reconstruction Of Collapsed Compound Wall Foundation, Including Providing Barbed Wire Fencing In Superstructure, Adjacent To Admin Building At Main Te Compound, Belgaum.
Organisation Central Public Procurement Portal 2
Tender Id 2023_BSNL_158657_1
Reference
Number
08/NIT/BSNL/CD/HBL/2023-24
Tender Fee 590
EMD 10760
Tender Value -
Place HUBBALLI
Link
View Original Tender Notice

https://etenders.gov.in

Start Date June 23, 2023 23:00
End Date
Expired 05/07/2023

Expired 1201 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Providing and fixing barbed wire fencing at etc school compound wall in sec-30a vashi.

Providing and fixing barbed wire fencing at etc school compound wall in sec-30a vashi.

Read more
Providing and fixing barbed wire fencing over existing compound wall at pantnagar garage under ex eng tr es

Providing and fixing barbed wire fencing over existing compound wall at pantnagar garage under ex eng tr es

Read more
Construction of transformer shed and providing barbed wire fencing on compound wall at swimming pool at sada, vasco.

Construction of transformer shed and providing barbed wire fencing on compound wall at swimming pool at sada, vasco.

Read more
Repairs to footpath hard standing interlocking chequered tiles culverts compound wall fencing steel gates barbed wire concertina coils and br works at dibt mysore

Repairs to footpath hard standing interlocking chequered tiles culverts compound wall fencing steel gates barbed wire concertina coils and br works at dibt mysore

Read more
Providing barbed wire fencing and renovation of damaged existing compound wall at guest house and subdivision office building at krishnagiri phase ii,kattiganapalli village s.f no.75/1pt,76 pt and 138/1pt,plot no.148b and 148c

Providing barbed wire fencing and renovation of damaged existing compound wall at guest house and subdivision office building at krishnagiri phase ii,kattiganapalli village s.f no.75/1pt,76 pt and 138/1pt,plot no.148b and 148c

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Gtdmca-mh2-reconstruction of compound wall barbed wire fencing-reconstruction of compound wall barbed wire fencing

Gtdmca--mh2-reconstruction of compound wall barbed wire fencing-reconstruction of compound wall barbed wire fencing

Read more
Gtdmca-mh2-reconstruction of compound wall barbed wire fencing-reconstruction of compound wall barbed wire fencing

General-gtdmca-accounts-mh2-reconstruction of compound wall barbed wire fencing-reconstruction of compound wall barbed wire fencing-general civil work

Read more
Reconstruction of collapsed compound wall (front side) of te

Reconstruction of collapsed compound wall (front side) of te &#x0d building at midc ,tarapur, dist - palghar (iiird call ) &#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise