Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
08/Nit/Bsnl/Cd/Hbl/2023 24
|
| Description |
Reconstruction Of Collapsed Compound Wall Foundation, Including Providing Barbed Wire Fencing In Superstructure, Adjacent To Admin Building At Main Te Compound, Belgaum.
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2023_BSNL_158657_1 |
|
Reference Number |
08/NIT/BSNL/CD/HBL/2023-24 |
| Tender Fee | 590 |
| EMD | 10760 |
| Tender Value | - |
| Place | HUBBALLI |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | June 23, 2023 23:00 |
| End Date |
Expired
05/07/2023
Expired 1201 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing and fixing barbed wire fencing at etc school compound wall in sec-30a vashi.
Providing and fixing barbed wire fencing at etc school compound wall in sec-30a vashi.
Read moreProviding and fixing barbed wire fencing over existing compound wall at pantnagar garage under ex eng tr es
Providing and fixing barbed wire fencing over existing compound wall at pantnagar garage under ex eng tr es
Read moreConstruction of transformer shed and providing barbed wire fencing on compound wall at swimming pool at sada, vasco.
Construction of transformer shed and providing barbed wire fencing on compound wall at swimming pool at sada, vasco.
Read moreRepairs to footpath hard standing interlocking chequered tiles culverts compound wall fencing steel gates barbed wire concertina coils and br works at dibt mysore
Repairs to footpath hard standing interlocking chequered tiles culverts compound wall fencing steel gates barbed wire concertina coils and br works at dibt mysore
Read moreProviding barbed wire fencing and renovation of damaged existing compound wall at guest house and subdivision office building at krishnagiri phase ii,kattiganapalli village s.f no.75/1pt,76 pt and 138/1pt,plot no.148b and 148c
Providing barbed wire fencing and renovation of damaged existing compound wall at guest house and subdivision office building at krishnagiri phase ii,kattiganapalli village s.f no.75/1pt,76 pt and 138/1pt,plot no.148b and 148c
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreGtdmca-mh2-reconstruction of compound wall barbed wire fencing-reconstruction of compound wall barbed wire fencing
Gtdmca--mh2-reconstruction of compound wall barbed wire fencing-reconstruction of compound wall barbed wire fencing
Read moreGtdmca-mh2-reconstruction of compound wall barbed wire fencing-reconstruction of compound wall barbed wire fencing
General-gtdmca-accounts-mh2-reconstruction of compound wall barbed wire fencing-reconstruction of compound wall barbed wire fencing-general civil work
Read moreReconstruction of collapsed compound wall (front side) of te
Reconstruction of collapsed compound wall (front side) of te 
 building at midc ,tarapur, dist - palghar (iiird call ) 
Read moreof your Industry type