Tender Details

Particulars Details
Title
Construction Of Leach Pit With Silt Chamber Sl 01 To 24 At K.Sujali Gp Under Islampur Panchayat Samity
Description
Construction Of Leach Pit With Silt Chamber Sl 01 To 24 At K.Sujali Gp Under Islampur Panchayat Samity
Organisation Zilla Parishad | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 1000
EMD 13003
Tender Value
Place K.Sujali GP
Link

AAAAAAAAAA

Login to view
Start Date May 24, 2025 23:30
End Date

04/06/2025 ( 10 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Loading of coal at colliery/colliery pit head/stack yard and transportation of coal by road with dumpers/ tippers/ hyva from different collieries/ coal washeries of bccl/ecl/ ccl/any other coal company tortps coalyard under distance slab-d(76-110 km)

Loading of coal at colliery/colliery pit head/stack yard and transportation of coal by road with dumpers/ tippers/ hyva from different collieries/ coal washeries of bccl/ecl/ ccl/any other coal company tortps coalyard under distance slab-d(76-110 km)

Read more
Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.

Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.

Read more
Special repairs to bldg no. t-105 (vsk) and roof treatment to bldg no p-17, p-21, p-22, p-24 and provn of two wheeler mt shed at cg complex under ge ludhiana

Special repairs to bldg no. t-105 (vsk) and roof treatment to bldg no p-17, p-21, p-22, p-24 and provn of two wheeler mt shed at cg complex under ge ludhiana

Read more
Capital grand fund 2024-2025 construction of retaining wall at main road channel south side kaliyamman koil street to arisikadai bus stand in devadanapatti town panchayat

Construction of retaining wall at main road channel south side kaliyamman koil street to arisikadai bus stand in devadanapatti town panchayat

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise