Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Constt. Of Bowali With Bathroom Nr.D.L Raina W.No 06
|
| Description |
Please Refer Boq
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_RDPR_228226_41 |
|
Reference Number |
e-NIT No. 90 REW Rajouri of 2023 Dated 31-08-2023 |
| Tender Fee | 500 |
| EMD | 3600 |
| Tender Value | |
| Place | Office of the Executive Engineer REW Rajouri |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | September 04, 2023 15:30 |
| End Date |
Expired
11/09/2023
Expired 1046 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConstt. of bowali with bathroom nr.d.l raina w.no 06
Constt. of bowali with bathroom nr.d.l raina w.no 06
Read moreConstt of bowali with bathroom upper mangal w.no 7
Constt of bowali with bathroom upper mangal w.no 7
Read moreConstt of bowali with bathroom at naban w.no. 04
Constt of bowali with bathroom at naban w.no. 04
Read moreConstt of bowali with bathroom upper mangal w.no 7
Constt of bowali with bathroom upper mangal w.no 7
Read moreof your Industry type