Tender Details
Particulars | Details |
---|---|
Title |
Feasibility Survey Work (Preliminary), Detailed Forest Clearance Dpr And Other Work For Converting 02 Lane Of Bhowali To Ramgarh Via Nathuwakhan To Quarb Under Cm Announcement 266 Of 2023 In Vidhanshaba Bhimtal
|
Description |
Feasibility Survey Work (Preliminary), Detailed Forest Clearance Dpr And Other Work For Converting 02 Lane Of Bhowali To Ramgarh Via Nathuwakhan To Quarb Under Cm Announcement 266 Of 2023 In Vidhanshaba Bhimtal
|
Organisation | Government of Uttarkhand |
Tender Id | 2023_pwd_64957_1 |
Reference Number |
2400_12AC_dt._17_10_2023_2 |
Tender Fee | 2950 |
EMD | 1.14 Lakh |
Tender Value | |
Place | Nainital |
Link | https://uktenders.gov.in |
Start Date | October 25, 2023 23:30 |
End Date |
07/11/2023 ( Expired 578 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreUnder the cm ghoshana no. 177/2024 of the construction work of road with interlocking tiles from the main road to ghosipura village via idgah in the village ghosipura under the assembly constituency mangalore of haridwar.
Under the cm ghoshana no. 177/2024 of the construction work of road with interlocking tiles from the main road to ghosipura village via idgah in the village ghosipura under the assembly constituency mangalore of haridwar.
Read morePreparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Preparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Read moreRepairs to joinery flooring sanitary fittings and other misc br work in toilets block of certain bldgs at adm bldgs areas of hq centre under age br meg of ge north bangalore
Repairs to joinery flooring sanitary fittings and other misc br work in toilets block of certain bldgs at adm bldgs areas of hq centre under age br meg of ge north bangalore
Read moreReconstruction of four lane (1v x 6.00 mtrs span) slab culvert across ukkayapalli channel at km 1.300 of krishna circle to devuni kadpa road in ysr kadapa district. under the main work of - krishna circle to devuni kadapa ( widening and strengthening of road from krishna theatre to devuni kadapa road via market yard from km 0/0 to 2/2)
Reconstruction of four lane (1v x 6.00 mtrs span) slab culvert across ukkayapalli channel at km 1.300 of krishna circle to devuni kadapa road in y.s.r kadapa district. under the main work of - krishna circle to devuni kadapa ( widening and strengthening of road from krishna theatre to devuni kadapa road via market yard from km 0/0 to 2/2)
Read moreReconstruction of four lane minor bridge (1v x 10.00 mtrs span) at km 1.230 of krishna circle to devuni kadapa road in ysr district. under the main work of - krishna circle to devuni kadapa ( widening and strengthening of road from krishna theatre to devuni kadapa road via market yard from km 0/0 to 2/2)
Reconstruction of four lane minor bridge (1v x 10.00 mtrs span) at km 1.230 of krishna circle to devuni kadapa road in y.s.r kadapa district. under the main work of - krishna circle to devuni kadapa ( widening and strengthening of road from krishna theatre to devuni kadapa road via market yard from km 0/0 to 2/2)
Read moreConstruction work of drain interlocking side track from bansal bus service to sanjay tables via start tables and drain construction in rahul katghar wali gali under swachh survey 2024-2025 in zone-3 tajganj ward no. 41.
Construction work of drain interlocking side track from bansal bus service to sanjay tables via start tables and drain construction in rahul katghar wali gali under swachh survey 2024-2025 in zone-3 tajganj ward no. 41.
Read moreConstruction of lt line and converting lt veasel to lt abc and other work
Construction of lt line and converting lt veasel to lt abc and other work in front of fire station&#x0d under edd-2 azamgarh
Read moreWbpwd/pw(r)/sepd/piu-i/nit-02 of 2025-2026,sl-1
Kalijhora dam to mandirkhola road via panbu dara road, from 0.00 kmp to 22.80 kmp strengthening work under kalimpong division, p.w.d., in the district of kalimpong under ridf-xxx. (2nd call)
Read moreConsultancy services of survey work, soil testing, design, drawing, preparation of dpr, vat, forest land and land acquisition file for con of road from two lanes to four lanes from km. 02 to 23 of km 16 of rishikesh bhaniyawala marg to airport
Consultancy services of survey work, soil testing, design, drawing, preparation of dpr, vat, forest land and land acquisition file for con of road from two lanes to four lanes from km. 02 to 23 of km 16 of rishikesh bhaniyawala marg to airport
Read moreof your Industry type