Tender Details
Particulars | Details |
---|---|
Title |
Design, Installation, Erection And Commissioning Of Sewage Treatment Plant Stp Of 0.50 Mld Capacity Based On Sbr Technology Including Operation And Maintenance For 5 Years Beyond Defect Liability Period Of 2 Year At Rs No.133 1 In Mahe.
|
Description |
Design, Installation, Erection And Commissioning Of Sewage Treatment Plant Stp Of 0.50 Mld Capacity Based On Sbr Technology Including Operation And Maintenance For 5 Years Beyond Defect Liability Period Of 2 Year At Rs No.133 1 In Mahe.
|
Organisation | Government of Puducherry |
Tender Id | 2023_PWDC2_14240_1 |
Reference Number |
64/EEM23-24/23(23-24) |
Tender Fee | 5250 |
EMD | 9.57 Lakh |
Tender Value | |
Place | PWD Division Mahe |
Link | https://pudutenders.gov.in |
Start Date | November 20, 2023 22:30 |
End Date |
03/01/2024 ( Expired 522 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreDesign, engineering, manufacture, supply, delivery, erection, testing and commissioning of odour control system for the existing 46 sewage pumping station including operation and maintenance for the period of 5 years
Design, engineering, manufacture, supply, delivery, erection, testing and commissioning of odour control system for the existing 46 sewage pumping station including operation and maintenance for the period of 5 years
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreSurvey site investigationdetailed design construction procurement and installation of required machinery equipment and instruments testing commissioning o and m of 10 years of 5 mld capacity zld based cetp at kalibeti khurdha on turnkey basis
Survey site investigationdetailed design construction procurement and installation of required machinery equipment and instruments testing commissioning o and m of 10 years of 5 mld capacity zld based cetp at kalibeti khurdha on turnkey basis
Read moreCanal water based water supply project for construction of 11.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 2.0 lakh gallon ohsr part-2 at machhiwara sahib town district
Canal water based water supply project for construction of 11.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 2.0 lakh gallon ohsr part-2 at machhiwara sahib town district
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Read moreCanal water based water supply project for construction of 5.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at mallanwala khass
Canal water based water supply project for construction of 5.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at mallanwala khass
Read moreCanal water based water supply project for construction of 4.3 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at talwandi bhai
Canal water based water supply project for construction of 4.3 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at talwandi bhai
Read moreWidening strengthening of g.t. road to bara pind dhuleta masani upto phagwara dosanjh mukandpur banga phillaur road km 0.00 to 16.10km 16.10 km jodr09 under 5054 rb10 pci 2 including maintenance of road for 5 years 1 year defect liability period 4 yr
Widening strengthening of g.t. road to bara pind dhuleta masani upto phagwara dosanjh mukandpur banga phillaur road km 0.00 to 16.10km 16.10 km jodr09 under 5054 rb10 pci 2 including maintenance of road for 5 years 1 year defect liability period 4 yr
Read moreCanal water based water supply project for construction of 3.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at mudki
Canal water based water supply project for construction of 3.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at mudki
Read moreof your Industry type