Tender Details

Particulars Details
Title
For Repairing Of 25 Kva, 63 Kva And 100 Kva Damaged Shell Type Three Phase T/F At Lesa Workshop, Aliganj
Description
For Repairing Of 25 Kva, 63 Kva And 100 Kva Damaged Shell Type Three Phase T/F At Lesa Workshop, Aliganj
Organisation Madhyanchal Vidyut Vitran Nigam Ltd | State Govt. and UT
Tender Id 2024_MVVNL_880614_1
Reference
Number
185/EWSC/LKO/2023-24
Tender Fee 1180
EMD 6250
Tender Value -
Place ALIGANJ
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1504311

Start Date January 13, 2024 00:25
End Date
Expired 18/01/2024

Expired 999 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tender for supply of equipment/material, design, erection, testing and commissioning of augmentation of existing 11/0.4 kv 25 kva sub-station parihar-iii (naghuien) to 63 kva along with three phase lt line from the augmented dtr

Tender for supply of equipment/material, design, erection, testing and commissioning of augmentation of existing 11/0.4 kv 25 kva sub-station parihar-iii (naghuien) to 63 kva along with three phase lt line from the augmented dtr in esd chamba 2

Read more
Provn of 35 kva generator set and replacement of 82.5 kva dg set qty 02 and provn of two 100 kva three phase online ups with 45 minutes backup time and 160 kva transformer and connected work

Provn of 35 kva generator set and replacement of 82.5 kva dg set qty 02 and provn of two 100 kva three phase online ups with 45 minutes backup time and 160 kva transformer and connected work

Read more
Tender for providing sop to m/s mbh power pvt. ltd. by augumentation of 25 kva to 63 kva s/stn. karyalag and prov. conversion of 1-phase to 3-phase lt line along with new 3-phase lt line in (e) section badhaghat under esd hpsebl, no.ii ghumarwin.

Tender for providing sop to m/s mbh power pvt. ltd. by augumentation of 25 kva to 63 kva s/stn. karyalag and prov. conversion of 1-phase to 3-phase lt line along with new 3-phase lt line in (e) section badhaghat under esd hpsebl, no.ii ghumarwin.

Read more
Provn of 02 x three phase silent generator sets (40 kva) along with overhead shed for simulator lab at 5 technical training regiment babmolim camp (goa).

Provn of 02 x three phase silent generator sets (40 kva) along with overhead shed for simulator lab at 5 technical training regiment babmolim camp (goa).

Read more
Purchase of 40 kva 11/0.433 kv three phase al. wound energy efficient level-2 completely self protected (csp) distribution transformers with provision of lt bushing box

Purchase of 40 kva 11/0.433 kv three phase al. wound energy efficient level-2 completely self protected (csp) distribution transformers with provision of lt bushing box

Read more
16 kva 11/0.433 kv three phase aluminium wound energy efficientt level-2 (2-star) rating completely selfprotected (csp) distribution transformers with having provision of lt bushing box

16 kva 11/0.433 kv three phase aluminium wound energy efficientt level-2 (2-star) rating completely selfprotected (csp) distribution transformers with having provision of lt bushing box

Read more
Creation of infrastructure and installation of 11/0.43 kv, 3x1000 kva distribution transformer for system strengthening of three phase power supply system at the high court of tripura, agartala

Creation of infrastructure and installation of 11/0.43 kv, 3x1000 kva distribution transformer for system strengthening of three phase power supply system at the high court of tripura, agartala

Read more
Custom bid for services - amc of electric loco cab air conditioners mounted on roof of all classes of three phase locomotives of diesel loco shed, new guwahati n f railway for a period of 1 year

Custom bid for services - amc of electric loco cab air conditioners mounted on roof of all classes of three phase locomotives of diesel loco shed, new guwahati n f railway for a period of 1 year

Read more
Estimate for construction of new 11 kv ht line and 3-phase lt line and lt re-organization to proposed 63 kva, 11/0.4 kv s/stn tikkari ii in (e) section local under electrical sub- division, hpsebl, chauntra.

Estimate for construction of new 11 kv ht line and 3-phase lt line and lt re-organization to proposed 63 kva, 11/0.4 kv s/stn tikkari ii in (e) section local under electrical sub- division, hpsebl, chauntra.

Read more
Provn of lightening protection at bldg no p-11 and p-12 and computer installation and installation of 20 kva ups and 5x 320 ltrs refrigerator for mh three phase electric connection for eme wksp under ge (east) mathura

Provn of lightening protection at bldg no p-11 and p-12 and computer installation and installation of 20 kva ups and 5x 320 ltrs refrigerator for mh three phase electric connection for eme wksp under ge (east) mathura

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise