Tender Details

Particulars Details
Title
Day To Day Shifting/ Relocation Of Pump Motor And Accessories To Be Installed At Different Location Of Mines And Repairing Of Different Dia Delevery Ranges (Running) At Patch A Area Ashok Ocp Under Piparwar Area. .(Transportation Of Materials
Description
Day To Day Shifting/ Relocation Of Pump Motor And Accessories To Be Installed At Different Location Of Mines And Repairing Of Different Dia Delevery Ranges (Running) At Patch A Area Ashok Ocp Under Piparwar Area. .(Transportation Of Materials
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_300245_1
Reference
Number
PO(AK)/PE(EnM)/e-NIT/23-24/107
Tender Fee 0
EMD 7000
Tender Value
Place Ashok OCP, Piparwar Area Chatra, Jharkhand-829201
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=311015
Start Date February 04, 2024 14:30
End Date

14/02/2024 ( Expired 493 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Advance preparation of new vertical pipeline range of 10 inch dia pipes in the cre patch for dewatering to outside of the mines, w.r.t konar exp ocp, bnk area

Advance preparation of new vertical pipeline range of 10 inch dia pipes in the cre patch for dewatering to outside of the mines, w.r.t konar exp ocp, bnk area

Read more
Dismantling, extension cum laying of the 8 inch dia m.s. pipes of the 2000 g.p.m. pump motor set, supplying water to the village pond in mine, w.r.t. karo ocp, under bnk area

Dismantling, extension cum laying of the 8 inch dia m.s. pipes of the 2000 g.p.m. pump motor set, supplying water to the village pond in mine, w.r.t. karo ocp, under bnk area

Read more
Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area

Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area&#x0d

Read more
Dismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year

Dismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year

Read more
(a)shifting of 4000 gpm pump motor of sadbhavna sump (b)erection of 10inch dia ms pipeline (2nd range) from the sump to the top bench of 4th patch and other miscellaneous job related with pumping and pipeline works of socp and mocp patch, ampc.

(a)shifting of 4000 gpm pump motor of sadbhavna sump (b)erection of 10inch dia ms pipeline (2nd range) from the sump to the top bench of 4th patch and other miscellaneous job related with pumping and pipeline works of socp and mocp patch, ampc.

Read more
Mtc. of different m.i. scheme during ...2025-26 under hezamara block area under w.r. sub-division mohanpur / sh_- repairing of pump and motor with suction delivery line, submerssible and horizontal motor rewinding including electrical accessories.

Mtc. of different m.i. scheme during ...2025-26 under hezamara block area under w.r. sub-division mohanpur / sh_- repairing of pump and motor with suction delivery line, submerssible and horizontal motor rewinding including electrical accessories.

Read more
Day to day maintenance of existing 6 inch dia pipeline with pump shifting/pipe shifting from 42 no. querry to prem nagar filter plant for the period of one year of peocp under hazaribag area

Day to day maintenance of existing 6 inch dia pipeline with pump shifting/pipe shifting from 42 no. querry to prem nagar filter plant for the period of one year of peocp under hazaribag area

Read more
Different type of pumping works related to shifting of pump-motor along with di and extension of delivery ranges per new position at jamunia patch of abocp mine

Different type of pumping works related to shifting of pump-motor along with di and extension of delivery ranges per new position at jamunia patch of abocp mine

Read more
Different type of pumping works related to shifting of pump-motor along with di and extension of delivery ranges per new position at jamunia patch of abocp mine

Different type of pumping works related to shifting of pump-motor along with di and extension of delivery ranges per new position at jamunia patch of abocp mine

Read more
Repairing /reconditioning of 04nos nflp starter, 3.3 kv grade for controlling of different pump-motor sets installed in different places in mines under ashok ocp, piparwar area.

Repairing /reconditioning of 04nos nflp starter, 3.3 kv grade for controlling of different pump-motor sets installed in different places in mines under ashok ocp, piparwar area.

Read more