Tender Details
Particulars | Details |
---|---|
Title |
Relocation Of Defunct 125 X115 Mm Dia 60 Mtr Deep Drilled Tube Well With Im Ii Hp With 32 Mm Dia Medium Class Gi Riser Pipe On Turnkey Basis Gr Reloc Dt Ctr 01 2 Nd Call
|
Description |
Relocation Of Defunct 125 X115 Mm Dia 60 Mtr Deep Drilled Tube Well With Im Ii Hp With 32 Mm Dia Medium Class Gi Riser Pipe On Turnkey Basis Gr Reloc Dt Ctr 01 2 Nd Call
|
Organisation | DWSD EinC | State Govt. and UT |
Tender Id | 2024_DWSD_92964_1 |
Reference Number |
DWSD/RELO/DT/CTR/08/2024-25 (2ND CALL) |
Tender Fee | 5000 |
EMD | 42000 |
Tender Value | |
Place | CHATRA |
Link | https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=125265 |
Start Date | September 13, 2024 19:30 |
End Date |
20/09/2024 ( Expired 232 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Re-location of 55 nos. defunct tube well in 2025-26 of 125/115 mm dia with 60.0 mtr deep drilled tube well with installation of india mark ii under baghmara block section baghmara (bag/sr7)
Re-location of 55 nos. defunct tube well in 2025-26 of 125/115 mm dia with 60.0 mtr deep drilled tube well with installation of india mark ii under baghmara block section baghmara (bag/sr7)
Read moreConstruction of 125 x 115 mm dia, 90 mtr. extra deep dt with installation of im ii hand pump with platform and drain for eco development village gua forest area under d.w. and s. division, chaibasa for the year 2025-26 (deposit head)
Construction of 125 x 115 mm dia, 90 mtr. extra deep dt with installation of im ii hand pump with platform and drain for eco development village gua forest area under d.w. and s. division, chaibasa for the year 2025-26 (deposit head)
Read moreDrilling of 120 mtr deep 20 no. 125 115 mm dia ordinary tube well with installation of hp in various villages of katni district
Drilling of 120 mtr deep 20 no. 125 115 mm dia ordinary tube well with installation of hp in various villages of katni district
Read moreDrilling of 20 nos. 60 mtr deep 300 100 mm dia g.p tube well with installation of h.p. in various villages of katni district
Drilling of 20 nos. 60 mtr deep 300 100 mm dia g.p tube well with installation of h.p. in various villages of katni district
Read moreSinking of 200 mm. dia deep tube well with top enlargement 300 mm. dia, depth of tube well is considered around 102 mtr with pvc pipe by direct rotary rig boring system within englishbazar municipality area, malda at ward no-18 on required location.
Sinking of 200 mm. dia deep tube well with top enlargement 300 mm. dia, depth of tube well is considered around 102 mtr with pvc pipe by direct rotary rig boring system within englishbazar municipality area, malda at ward no-18 on required location.
Read moreRe-location of 82 nos. defunct tube well in 2025-26 of 125/115 mm dia with 60.0 mtr deep drilled tube well with installation of india mark ii under baghmara block section katras in dmft fund (kat/sr6)
Re-location of 82 nos. defunct tube well in 2025-26 of 125/115 mm dia with 60.0 mtr deep drilled tube well with installation of india mark ii under baghmara block section katras in dmft fund (kat/sr6)
Read moreSinking of 1 no. 330.00 mtr. deep 100 x 50 mm. dia. tube well fitted with indian mark - ii pump with pvc pipe and strainers at dwarirjungle 7 no. shibmandir, singh para dwarirjungle mouza, sandeshkhali-ii block under hasnabad sub-division, p.h.e. dte
Sinking of 1 no. 330.00 mtr. deep 100 x 50 mm. dia. tube well fitted with indian mark - ii pump with pvc pipe and strainers at dwarirjungle 7 no. shibmandir, singh para dwarirjungle mouza, sandeshkhali-ii block under hasnabad sub-division, p.h.e. dte
Read moreDrilling of 150/125/115 mm dia 90 mtr. deep telescopic tube well with installation of hand pump and construction of plateform in different villages of block ghughri district mandla (nos. of tube wells 80 nos)..
Drilling of 150/125/115 mm dia 90 mtr. deep telescopic tube well with installation of hand pump and construction of plateform in different villages of block ghughri district mandla (nos. of tube wells 80 nos)..
Read moreConstruction of solar based water supply scheme with 1.0 hp dc solar motor pump complete and extra deep dt 125mm x115mm x120.00 m deep drilled tube well to supply water 2000 lph for 24x7 supply at habitation- munda upper tola, village- karamba
Construction of solar based water supply scheme with 1.0 hp dc solar motor pump complete and extra deep dt 125mm x115mm x120.00 m deep drilled tube well to supply water 2000 lph for 24x7 supply at habitation- munda upper tola, village- karamba
Read moreConstruction of rural water supply scheme with 1.0 hp dc solar motor pump complete deep t w of 125 115mm dia, 90 mtrs deep drilled tube well for pm janman which is not included in mvs and cluster , under d. w. and s division saraikela
Construction of rural water supply scheme with 1.0 hp dc solar motor pump complete deep t w of 125 115mm dia, 90 mtrs deep drilled tube well for pm janman which is not included in mvs and cluster , under d. w. and s division saraikela
Read moreof your Industry type