Tender Details
Particulars | Details |
---|---|
Title |
Condenser Tubes Cleaning Through Bullet Shot Method During Annual Oh Of Unit No. 3 Of 3x210 Mw, Atps, Anpara
|
Description |
Condenser Tubes Cleaning Through Bullet Shot Method During Annual Oh Of Unit No. 3 Of 3x210 Mw, Atps, Anpara
|
Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 590 |
EMD | 8000 |
Tender Value | |
Place | Anpara |
Link |
AAAAAAAAAA Login to view |
Start Date | May 09, 2025 18:30 |
End Date |
23/06/2025 ( 21 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairs of long angle and short angle suction strainer baskets of bfp, suction line strainer of raw water line, mot strainer and cep strainer of unit 3 of 3x210mw, atps, anpara.
Repairs of long angle and short angle suction strainer baskets of bfp, suction line strainer of raw water line, mot strainer and cep strainer of unit 3 of 3x210mw, atps, anpara.
Read moreOverhauling of medium pressure pumps unit drain tank unit flash tanks hot well cleaning, overhauling of working oil and lub oil coolers of bfps of unit no.3 3x210mw of atps, anpara.
Overhauling of medium pressure pumps unit drain tank unit flash tanks hot well cleaning, overhauling of working oil and lub oil coolers of bfps of unit no.3 3x210mw of atps, anpara.
Read moreIn situ inspection of boiler pressure part tubes by rfet (remote field electromagnetic technique) during overhauling of unit no-03 of 3x210 mw, atps, anpara, sonebhadra.
In situ inspection of boiler pressure part tubes by rfet (remote field electromagnetic technique) during overhauling of unit no-03 of 3x210 mw, atps, anpara, sonebhadra.
Read moreCondenser tubes cleaning through bullet shot method during annual oh of unit no.-3 of 3x210mw, atps, anpara
Condenser tubes cleaning through bullet shot method during annual oh of unit no.-3 of 3x210mw, atps, anpara
Read moreApplication and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Read moreOverhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Overhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Read moreWidening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Read moreErection, commissioning and testing of 3 ton hoist and its rail beam steal structure at cooling tower of unit no.7 of 2x500 mw dtps anpara
Erection, commissioning and testing of 3 ton hoist and its rail beam steal structure at cooling tower of unit no.7 of 2x500 mw dtps anpara
Read moreWork of cleaning for turbine, boiler, ash handling area of unit no 9, 10, 11, 12 and 13 of 5x200 mw, btps and mcb, compressor house and sump pump house of atps, obra
Work of cleaning for turbine, boiler, ash handling area of unit no 9, 10, 11, 12 and 13 of 5x200 mw, btps and mcb, compressor house and sump pump house of atps, obra.
Read moreEddy current testing of condenser tubes for unit 5
Eddy current testing of condenser tubes for unit 5&#x0d during upcoming overhauling of unit 5.
Read moreof your Industry type